Excavation may be classified by type of material: [1]: 13.1 Topsoil excavation; Earth excavation; Rock excavation; Muck excavation – this usually contains excess water and unsuitable soil; Unclassified excavation – this is any combination of material types; Excavation may be classified by the purpose: [1]: 13.1, 13.2
A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...
Slurry walls are typically constructed by starting with a set of concrete guide walls, typically 1 metre (3 ft 3 in) deep and 0.5 metres (1 ft 8 in) thick. The guide walls are constructed near the ground surface to outline the desired slurry trench, and to guide the excavation machinery.
An embankment is a raised wall, bank or mound made of earth or stones, that are used to hold back water or carry a roadway. A road , railway line , or canal is normally raised onto an embankment made of compacted soil (typically clay or rock-based) to avoid a change in level required by the terrain , the alternatives being either to have an ...
Buildings with straight walls longer than 5 m (16.4 ft) in length need intersecting walls or bracing buttresses. International standards exist for bracing wall size and spacing for earthen construction in different types of seismic risk areas, most notably the performance-based standards of New Zealand [ 1 ] recommended by the ASTM ...
In the construction industry, the 1:5:200 rule (or 1:5:200 ratio) is a rule of thumb that states that: . If the initial construction costs of a building is 1, then its maintenance and operating costs over the years is 5, and the business operating costs (salary of people working in that building) is 200.
The output obtained from a site mix concrete plant using a 8/12 mixer is 4 to 5 metric cubes per hour which is 30-60 metric cubes per hour in a ready mix concrete plant. Better handling and proper mixing practice will help reduce the consumption of cement by 10 – 12%.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...