Ad
related to: bommanahalli metro station opening date full episode today free live
Search results
Results from the WOW.Com Content Network
Bommanahalli (also known as Roopena Agrahara) is an upcoming elevated metro station on the North–South corridor of the Yellow Line of Namma Metro in Bangalore, India.. As per latest reports, the Yellow Line is slated to be operational around April 2025 [1] instead of January 2025 [2] with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
The Yellow Line of Namma Metro is a nearly-completed part of the metro rail network of Bengaluru, India.The 18.82 km (11.69 mi)-long line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. [1]
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Bommasandra metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro.
The BMRCL charges ₹ 50,000 (US$590) for shooting inside a metro station, and ₹ 40,000 (US$470) for shoots inside a metro train during peak hours between 6 am to 10 pm. During non-peak hours, from 10 pm to 4 am, the agency charges ₹ 50,000 (US$590) for shoots inside metro stations and ₹ 20,000 (US$230) inside a train.
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Central Silk Board metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro.
Out of the operational 68 metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. [2] [3] Evolution of Namma Metro. The first section (on the Purple Line) of the Namma Metro system opened on 20 October 2011 between Baiyappanahalli and M.G Road. The system is ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
The total roofing area of the 10 stations on the stretch was 47,000 square metres (510,000 sq ft). [24] [25] The first section of Green Line was opened to public on 1 March 2014. [26] BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers traveled on the line on the opening day. [27]
Ad
related to: bommanahalli metro station opening date full episode today free live