Search results
Results from the WOW.Com Content Network
Figure 4. The MGRS grid around the North Pole. In the polar regions, a different convention is used. [7] South of 80°S, UPS South (Universal Polar Stereographic) is used instead of a UTM projection. The west half-circle forms a grid zone with designation A; the east half-circle forms one with designation B; see figure 3.
C-squares (acronym for the Concise Spatial QUery And REpresentation System) is a system of spatially unique, location-based identifiers for areas on the surface of the earth, represented as cells from a latitude- and longitude-based Discrete Global Grid at a hierarchical set of resolution steps, obtained by progressively subdividing 10×10 degree World Meteorological Organization squares; the ...
World Meteorological Organization (WMO) squares is a system of geocodes that divides a world map with latitude-longitude gridlines into grid cells of 10° latitude by 10° longitude, each with a unique, 4-digit numeric identifier.
Each 30-minute cell is divided into four 15-minute by 15-minute quadrants. The quadrants are numbered sequentially, from west to east, starting with the northernmost band. Specifically, the northwest quadrant is “1”; the northeast quadrant is “2”; the southwest quadrant is “3”; the southeast quadrant is “4”.
These letters form the third and fourth characters of a full GEOREF coordinate. Four letters thus identify any 1-degree quadrangle in the world. Each of the 1-degree quadrangles is further subdivided into 60 1-minute longitude zones, numbered 00 through 59 from west to east, and 60 1-minute latitude bands, numbered 00 to 59 from south to north.
The National Transformation version 2 is a Canadian version of NADCON for transforming between NAD 1927 and NAD 1983. HARNs are also known as NAD 83/91 and High Precision Grid Networks (HPGN). [27] Subsequently, Australia and New Zealand adopted the NTv2 format to create grid-based methods for transforming among their own local datums.
We are just days from the Indianapolis 500 and the starting grid is set. After two days of qualifying, Scott McLaughlin earned the pole position at 234.220 mph for his 4-lap run around the 2.5 ...
The DTED format for level 0, 1 and 2 is described in U.S. Military Specification Digital Terrain Elevation Data (DTED) MIL-PRF-89020B, and amongst other parameters describes the resolution for each level: Level 0 has a post spacing of approximately 900 meters. Level 1 has a post spacing of approximately 90 meters.