Search results
Results from the WOW.Com Content Network
A percolation test (colloquially called a perc test) is a test to determine the water absorption rate of soil (that is, its capacity for percolation) in preparation for the building of a septic drain field (leach field) or infiltration basin. [1] The results of a percolation test are required to design a septic system properly.
A septic drain field, a septic tank, and associated piping compose a septic system. The drain field typically consists of an arrangement of trenches containing perforated pipes and porous material (often gravel) covered by a layer of soil to prevent animals (and surface runoff) from reaching the wastewater distributed within those trenches. [1]
Unlike the traditional septic system, the aerobic treatment system produces a high quality secondary effluent, which can be sterilized and used for surface irrigation. This allows much greater flexibility in the placement of the leach field, as well as cutting the required size of the leach field by as much as half. [1]
In the UK, a cesspit is a closed tank for the reception and temporary storage of sewage; in North America, this is simply referred to as a "holding tank".Because it is sealed, the tank must be emptied frequently – on average every 6 weeks [2] – but frequency varies a great deal and can be as often as weekly or as rarely as quarterly.
Schematic of a septic tank [2] Septic tank and septic drain field. A septic tank consists of one or more concrete or plastic tanks of between 4,500 and 7,500 litres (1,000 and 2,000 gallons); one end is connected to an inlet wastewater pipe and the other to a septic drain field. Generally these pipe connections are made with a T pipe, allowing ...
The House Ethics Committee secretly voted earlier this month to release its report into the conduct of former Rep. Matt Gaetz before the end of this Congress, according to multiple sources with ...
The deep end of the pool won't need to be drained. ... the release said, depending on weather. Fassnight Pool's normal hours are Sundays, Mondays, Thursdays and Fridays, 1-6:30 p.m. Due to the ...
A water table close to the surface affects excavation, drainage, foundations, wells and leach fields (in areas without municipal water and sanitation), and more. When excavation occurs near enough to the water table to reach its capillary action, groundwater must be removed during construction.