Search results
Results from the WOW.Com Content Network
NTPC is also developing a joint-venture coal-based power plant 1,320 MW (2x660) with the Bangladesh Power Development Board known as Bangladesh India Friendship Power Company in Rampal, Bangladesh, which is facing tremendous opposition from the people of Bangladesh owing to the plant's dangerously close proximity to the Sundarbans. [21]
Name Location Capacity (MW) Commissioned Refs Al Arish Al `Arish: 8.5 (at commission date): 1975 [1]Mesaieed Mesaieed Industrial Area: 2007 2008–2010 [2]Qatalum: Mesaieed Industrial Area
On 29 January 2012, the Bangladesh Power Development Board signed an agreement with NTPC to build the plant. [9] The joint venture company is known as Bangladesh India Friendship Power Company (BIFPC). [10] The BPDB and the NTPC agreed to implement the project on a 50:50 equity basis. The NTPC will set up and operate the plant. [11]
Ashuganj Power Station Company Limited; Bakhrabad Gas Distribution Company Limited; Bangladesh Agricultural Development Corporation; Bangladesh Blade Factory Limited; Bangladesh Chemical Industries Corporation; Bangladesh Communication Satellite Company Limited; Bangladesh Diesel Plant Limited; Bangladesh Film Development Corporation
Edisun Power Point & Haor Bangla - Korea Green Energy Ltd is the 32 MW Sunamganj solar park project. The government has taken a total of 19 solar power projects of total 1070 MW capacity which got the Prime Minister's approval in principle as part of its plan to generate 10 percent electricity from renewable energy source by 2020.
Rajmahal open cast project (earlier known as Lalmatia Colliery) supplies coal to the Farakka Super Thermal Power Station and the 2,340 MW Kahalgaon Super Thermal Power Station. [2] Coal import from Indonesia for Farakka Super Thermal Power Plant by Farakka Port and National Waterway 1.Jindal ITF Limited coal carry by barge from Haldia Port to ...
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
The planned capacity of the power plant is 1980 MW (3x660 MW). The project was originally proposed in 1999 but got delayed because Coal India Limited objected to the location of the power plant and wanted NTPC to relocate the power plant as it was coming up on site having 6 billion tonnes of coal underneath it.