Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Concrete is poured around these plastic forms to create internal voids in the slab A voided biaxial slab installation in Turkey. Voided biaxial slabs, sometimes called biaxial slabs or voided slabs, are a type of reinforced concrete slab which incorporates air-filled voids to reduce the volume of concrete required.
Prestressed concrete is a major advance in concrete engineering and has effectively been used in rigid frame bridge construction. [10] This is notable because it was already challenging to place standard reinforcing in a concrete rigid frame bridge. Prestressing the rebars is more difficult but was proven to still be feasible. [10]
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
The derivation of the maximum arching moment of resistance of laterally restrained concrete bridge deck slabs utilised Rankin's [21] idealised elastic-plastic stress-strain criterion for concrete, valid for concrete cylinder strengths up to at least 70N/mm 2, which he had derived on the basis of Hognestad, Hanson and McHenry's [23] ultimate ...
The floor systems are mostly built from pre-topped double tees. This system evolved from the earlier use of tee systems where the flanges of the T-beams were connected. The concrete is then poured at the top of the tees during the construction to create the floor surface, hence the process is called field-placed concrete topping.
François Hennebique (26 April 1842 – 7 March 1921) was a French engineer and self-educated builder who patented his pioneering reinforced-concrete construction system in 1892, integrating separate elements of construction, such as the column and the beam, into a single monolithic element. The Hennebique system was one of the first ...
Another fabrication system produces hollow-core floor slabs in reinforced concrete (not prestressed). These are made on carousel production lines, directly to exact length, and as a stock product. However, the length is limited to about 7-8 meters. Especially in Belgium, this method is widely used in private housing.