enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. ISO 10628 - Wikipedia

    en.wikipedia.org/wiki/ISO_10628

    ISO 10628 Diagrams for the chemical and petrochemical industry specifies the classification, content, and representation of flow diagrams. It does not apply to electrical engineering diagrams. ISO 10628 consists of the following parts: Part 1: Specification of Diagrams (ISO 10628-1:2014) [1] Part 2: Graphical Symbols (ISO 10628-2:2012)

  3. Tap changer - Wikipedia

    en.wikipedia.org/wiki/Tap_changer

    A mechanical tap changer physically makes the new connection before releasing the old using multiple tap selector switches but avoids creating high circulating currents by using a diverter switch to temporarily place a large diverter impedance in series with the short-circuited turns.

  4. Well control - Wikipedia

    en.wikipedia.org/wiki/Well_control

    the drilling and operating companies well control policies. For workover or completion operations, other methods are often used. Bullheading is a common way to kill a well during workovers and completions operations but is not often used while drilling. Reverse circulation is another kill method used for workovers that are not used for drilling ...

  5. Oil well control - Wikipedia

    en.wikipedia.org/wiki/Oil_well_control

    As technology has advanced, more modern drillers have better control of the overall well. Oil well control is the management of the dangerous effects caused by the unexpected release of formation fluid, such as natural gas and/or crude oil, upon surface equipment of oil or gas drilling rigs and escaping into the atmosphere.

  6. List of components of oil drilling rigs - Wikipedia

    en.wikipedia.org/wiki/List_of_components_of_oil...

    Rotary table (#20) rotates, along with its constituent parts, the kelly and kelly bushing, the drill string and the attached tools and bit. Shale shaker (#2) separates drill cuttings from the drilling fluid before it is pumped back down the wellbore. Stand (#16) is a section of 2 or 3 joints of drill pipe connected and stood upright in the ...

  7. DIN 72552 - Wikipedia

    en.wikipedia.org/wiki/DIN_72552

    starter control 50a 50f starter control 50 50g starter control 50a 50h starter control 50 Battery 15 battery+ through ignition switch 16, 54/15 30 from battery+ direct 30/51 30a from 2nd battery and 12/24 V relay: 31 return to battery- or direct to ground 31a return to battery- 12/24 V relay 31b return to battery- or ground through switch 85d 31c

  8. Completion (oil and gas wells) - Wikipedia

    en.wikipedia.org/wiki/Completion_(oil_and_gas_wells)

    The tubing may also have flow control mechanism. Single-well concentric kill string: within the well a small diameter concentric kill string is used to circulate kill fluids when needed. Single-well 2-tubing completion: in this instance 2 tubing strings are inserted down 1 well. They are connected at the lower end by a circulating head.

  9. Christmas tree (oil well) - Wikipedia

    en.wikipedia.org/wiki/Christmas_tree_(oil_well)

    Functionality may be extended further by using the control system on a subsea tree to monitor, measure, and react to sensor outputs on the tree or even down the well bore. The control system attached to the tree controls the downhole safety valve (SCSSV, DHSV, SSSV) while the tree acts as an attachment and conduit means of the control system to ...