The slab can be decoupled from ground temperatures by insulation, with the concrete poured directly over insulation (for example, extruded polystyrene foam panels), or heating provisions (such as hydronic heating) can be built into the slab. Slab-on-grade foundations should not be used in areas with expansive clay soil.
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
A steel-reinforced concrete grade beam may be poured at the surface to provide ground clearance for the structure. If an insulated slab is to be poured inside the grade beam, then the outer surface of the grade beam and the rubble trench should be insulated with rigid XPS foam board, which must be protected above grade from mechanical and UV ...
A common type of insulated slab is the beam and block system (mentioned above) which is modified by replacing concrete blocks with expanded polystyrene blocks. [11] This not only allows for better insulation but decreases the weight of slab which has a positive effect on load bearing walls and foundations. Formwork set for concrete pour.
Exterior insulation and finish system (EIFS) is a general class of non-load bearing building cladding systems that provides exterior walls with an insulated, water-resistant, finished surface in an integrated composite material system. EIFS has been in use since the 1960s in North America and was first used on masonry buildings.
The only remaining drawback to this kind of thermal mass solar architecture is the absence of a basement, as in any slab-on grade design. The Kachadorian floor design is a direct-gain passive solar system, but its thermal mass also acts as an indirect heating (or cooling) element, giving up its heat at night.
In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...