Search results
Results from the WOW.Com Content Network
The first macadam road built in the United States was constructed between Hagerstown and Boonsboro, Maryland, and was named at the time Boonsborough Turnpike Road. This was the last section of unimproved road between Baltimore on the Chesapeake Bay to Wheeling on the Ohio River. Before it was macadamized, stagecoaches travelling the Hagerstown ...
Example of a site plan. A plot plan. A site plan or a plot plan is a type of drawing used by architects, landscape architects, urban planners, and engineers which shows existing and proposed conditions for a given area, typically a parcel of land which is to be modified. Sites plan typically show buildings, roads, sidewalks and paths/trails ...
The issuance of a drawing from the engineering/design activity to the production activity. In other words, the event when a draft becomes a completed, official document. A stamp on the drawing saying "ISSUED" documents that RTP has occurred. RTV: room-temperature vulcanizing; return to vendor: 1. RTV sealants, a way to seal joints. 2.
Example mechanical drawing. Here is an example of an engineering drawing (an isometric view of the same object is shown above). The different line types are colored for clarity. Black = object line and hatching; Red = hidden line; Blue = center line of piece or opening; Magenta = phantom line or cutting plane line
The alignment is the route of the road, defined as a series of horizontal tangents and curves. The profile is the vertical aspect of the road, including crest and sag curves, and the straight grade lines connecting them. The cross section shows the position and number of vehicle and bicycle lanes and sidewalks, along with their cross slope or ...
ISO 8048:1984 Technical drawings — Construction drawings — Representation of views, sections and cuts; ISO 8560:2019 Technical drawings — Construction drawings — Representation of modular sizes, lines and grids; ISO 8826-1:1989 Technical drawings — Rolling bearings — Part 1: General simplified representation
Layers in the construction of a mortarless pavement: A.) Subgrade B.) Subbase C.) Base course D.) Paver base E.) Pavers F.) Fine-grained sand. In highway engineering, subbase is the layer of aggregate material laid on the subgrade, on which the base course layer is located. It may be omitted when there will be only foot traffic on the pavement ...
The construction documents, specifically the technical specifications, require the contractor to submit product data, samples, and shop drawings to the architect and engineer for approval. This is one of the first steps that is taken by the contractor after execution of the construction contract and issuance of the "Notice to Proceed".