Search results
Results from the WOW.Com Content Network
Main page; Contents; Current events; Random article; About Wikipedia; Contact us
The art of constructing ground plans (ichnography; Gr. τὸ ἴχνος, íchnos, "track, trace" and γράφειν, gráphein, "to write"; [1] pronounced ik-nog-rəfi) was first described by Vitruvius (i.2) and included the geometrical projection or horizontal section representing the plan of any building, taken at such a level as to show the ...
A 1:1 scale construction drawing of a boat and its parts Lines plan A scaled-down version of a full-sized drawing often including the body, plan, profile, and section views Body Plan A view of the boat from both dead ahead and dead astern split in half Plan view A view looking down on the boat from above Profile view A view of the boat from the ...
A common use is to specify the geometry necessary for the construction of a component and is called a detail drawing. Usually, a number of drawings are necessary to completely specify even a simple component. These drawings are linked together by a "master drawing." This "master drawing" is more commonly known as an assembly drawing.
The original Backrooms image posted on 4chan, of a HobbyTown under renovation.. The Backrooms are a fictional location originating from a 2019 4chan thread. One of the best known examples of the liminal space aesthetic, the Backrooms are usually portrayed as an impossibly large extradimensional expanse of empty rooms, accessed by exiting ("no-clipping out of") reality.
the effective and timely integration of construction knowledge into the conceptual planning, design, construction, and field operations of a project to achieve the overall project objectives in the best possible time and accuracy at the most cost-effective levels (CII definition).
Timber-frame building showing considerable, but tolerable, settlement. Settlement is the downward movement or the sinking of a structure's foundation.It is mostly caused by changes in the underlying soil, such as drying and shrinking, wetting and softening, or compression due to the soil being poorly compacted when construction started. [1]
Conversely, the obvert level is the highest interior level, and can be considered the "ceiling" level, being the highest level of that sewer. The bottom of the sewer is called the invert from a general resemblance in construction to an "inverted" arch. [2] An inverted arch is a rounded structure with its crown facing in the downward position.