The project was originally proposed in 1999 but got delayed because Coal India Limited objected to the location of the power plant and wanted NTPC to relocate the power plant as it was coming up on site having 6 billion tonnes of coal underneath it. Coal India Limited withdrew the coal linkage to the plant in 2008.
Location: Patratu, Ramgarh district, Jharkhand: Coordinates: Status: under-construction: Construction began: May 2018: Owner: NTPC: Thermal power station ; Primary fuel: Coal: Power generation; Units operational: 3 X 800 MW (Stage 1) under construction 2 X 800 MW (Stage 2) planned: Make and model: BHEL
The 5 kilometres (3.1 mi) long, 55 metres (180 ft) high earthfill dam with composite masonry cum concrete spillway, Tenughat Dam, across the Damodar River, is operated by the Government of Jharkhand. The average annual rainfall is 1,291.2 millimetres (50.83 in).
According to the 2011 Census of India, Tandwa (location code 349450) had a total population of 6,475 of which 3,438 (53%) were males and 3,037 (47%) were females. Population in the age range 0–6 years was 1,081. The total number of literate persons in Tandwa was 3,948 (73.19% of the population over 6 years). [4]
As of April 2015, there is plan to float a joint venture company with National Thermal Power Corporation holding 74% and Jharkhand government holding 26%. The new company will set up a 4000 MW (800 MW × 5) Patratu Super Thermal Power Project which will utilize 1500 acres out of 6300 acres available with the existing power plant.
Jharkhand has 1844.00 km of national highways, 1886.40 km of state highways, 4828.10 km of major district roads and 166.00 km of other roads, totalling 8724.50 km of roads in the state. [ 1 ] Expressways
The two-letter state code for Telangana Region in Andhra Pradesh was AP until the State Bifurcation and after the formation of Telangana State, the state was chosen as TS. It continued up to May 2024 before it was changed to TG. [6] The AP and TS codes, however, remain valid.
Magadh Opencast Project was identified for a rated capacity of 12.0 million tonnes per year for supplying coal to the North Karanpura Thermal Power Station (3X660 MW) of NTPC Limited at Tandwa. Estimated mineable reserve of Magadh OCP was 351 million tonnes.