Search results
Results from the WOW.Com Content Network
Rebar for foundations and walls of a sewage pump station. The Paulins Kill Viaduct , Hainesburg, New Jersey, is 115 feet (35 m) tall and 1,100 feet (335 m) long, and was heralded as the largest reinforced concrete structure in the world when it was completed in 1910 as part of the Lackawanna Cut-Off rail line project.
Tilt-up construction requires significant organization and collaboration on the building site. The chronological steps that need to be taken for a tilt-up project are: site evaluation, engineering, footings and floor slabs, forming tilt-up panels, steel placement, embeds and inserts, concrete placement, panel erection and panel finishing.
Rebar detailing is the discipline of preparing 'shop/placing' or 'fabrication' drawings or shop drawings of steel reinforcement for construction. Engineers prepare 'design drawings' that develop required strengths by applying rebar size, spacing, location, and lap of steel .
Slipform stonemasonry is a method for making a reinforced concrete wall with stone facing in which stones and mortar are built up in courses within reusable slipforms. It is a cross between traditional mortared stone wall and a veneered stone wall. Short forms, up to 60 cm high, are placed on both sides of the wall to serve as a guide for the ...
Rebar is most commonly manufactured in grades 40, 60, and 75 with higher strength readily available in grades 80, 100, 120 and 150. Grade 60 (420 MPa) is the most widely used rebar grade in modern US construction. Historic grades include 30, 33, 35, 36, 50 and 55, which are not in common use today.
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Suspended slab under construction, with the formwork still in place Suspended slab formwork and rebar in place, ready for concrete pour.. A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete.
Rebar has been stubbed up out of the concrete slab to form the base of future columns Timber formwork for a concrete column. Adjustable metal screw jacks both stabilize and plumb the form Aluminum formwork system Sketch of the side view of traditional timber formwork used to form a flight of stairs Placing a wall form. A matching form will be ...