Ad
related to: cement curing time chart
Search results
Results from the WOW.Com Content Network
A cement accelerator is an admixture for the use in concrete, mortar, rendering or screeds. The addition of an accelerator speeds the setting time and thus cure time starts earlier. [ 1 ] This allows concrete to be placed in winter with reduced risk of frost damage. [ 2 ]
Accelerated curing is any method by which high early age strength is achieved in concrete. These techniques are especially useful in the prefabrication industry, wherein high early age strength enables the removal of the formwork within 24 hours, thereby reducing the cycle time, resulting in cost-saving benefits. [ 1 ]
Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material. [2] Its usage worldwide, ton for ton, is twice that of steel, wood, plastics, and aluminium combined. [3]
The ultimate strength of concrete is influenced by the water-cementitious ratio (w/cm), the design constituents, and the mixing, placement and curing methods employed.All things being equal, concrete with a lower water-cement (cementitious) ratio makes a stronger concrete than that with a higher ratio. [2]
The main factors influencing temperature variation in the mass concrete structure are: the size of the structure, the ambient temperature, the initial temperature of the concrete at the time of placement and curing program, the cement type, and the cement contents in the mix.
In the US, after World War One, the long curing time of at least a month for Rosendale cement made it unpopular for constructing highways and bridges, and many states and construction firms turned to Portland cement. Because of the switch to Portland cement, by the end of the 1920s only one of the 15 Rosendale cement companies had survived.
Portland cement is the most common type of cement in general use around the world as a basic ingredient of concrete, mortar, stucco, and non-specialty grout. It was developed from other types of hydraulic lime in England in the early 19th century by Joseph Aspdin , and is usually made from limestone .
Therefore, when concreting at cold temperature cannot be avoided, it is essential to have a minimum curing time at a temperature sufficiently above the freezing point of the concrete pore water, so that the early strength of concrete is high enough to resist the inner tensile stress caused by water freezing. [5]
Ad
related to: cement curing time chart