Search results
Results from the WOW.Com Content Network
Pump pressure, which is also referred to as system pressure loss, is the sum total of all the pressure losses from the oil well surface equipment, the drill pipe, the drill collar, the drill bit, and annular friction losses around the drill collar and drill pipe. It measures the system pressure loss at the start of the circulating system and ...
The formula is also common in the pipeline industry to verify that pipe used for gathering, transmission, and distribution lines can safely withstand operating pressures. The design factor is multiplied by the resulting pressure which gives the maximum operating pressure (MAOP) for the pipeline.
It is an indication of the minimum stress a pipe may experience that will cause plastic (permanent) deformation. The SMYS is required to determine the maximum allowable operating pressure (MAOP) of a pipeline, as determined by Barlow's Formula which is P = (2 * S * T)/(OD * SF), where P is pressure, OD is the pipe’s outside diameter, S is the ...
Column Y of the tube represents the annulus, and column X represents the pipe (string) in the well. The bottom of the U-tube represents the bottom of the well. In most cases, fluids create hydrostatic pressure in both the pipe and annulus. Atmospheric pressure can be omitted since it works the same on both columns.
Positive-pulse tools briefly close and open the valve to restrict the mud flow within the drill pipe. This produces an increase in pressure that can be seen at surface. The digital information can be encoded in the pressure signal using line codes or pulse-position modulation. [8] Diagram showing the MWD Negative pulse
Casing placement is selected so that the hydrostatic pressure of the drilling fluid remains at a pressure level that is between formation pore pressures and fracture pressures. [ 6 ] [ 5 ] In order to reduce cost, a liner may be used which extends just above the shoe (bottom) of the previous casing interval and hung off downhole rather than at ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Drill pipe is most often considered premium class, which is 80% remaining body wall (RBW). After inspection determines that the RBW is below 80%, the pipe is considered to be Class 2 or "yellow band" pipe. Eventually the drill pipe will be graded as scrap and marked with a red band. Drill pipe is a portion of the overall drill string.