Ad
related to: saturn v inertial platform lift
Search results
Results from the WOW.Com Content Network
The ST-124-M3 inertial platform was a device for measuring acceleration and attitude of the Saturn V launch vehicle. It was carried by the Saturn V Instrument Unit, a 3-foot-high (0.91 m), 22-foot-diameter (6.7 m) section of the Saturn V that fit between the third stage (S-IVB) and the Apollo spacecraft. Its nomenclature means "stable table ...
The Saturn V instrument unit is a ring-shaped structure fitted to the top of ... Drawing on the ST-124-M3 inertial platform. The Saturn V launch vehicle was guided by ...
The committee recommended the development of new, hydrogen-burning upper stages for the Saturn, and outlined eight different configurations for heavy-lift boosters ranging from very low-risk solutions making heavy use of existing technology, to designs that relied on hardware that had not been developed yet, including the proposed new upper stage.
The basic configuration for this heavy-lift vehicle was selected in early 1963, and the name Saturn V was applied at that time (configurations that might have led to Saturn II, III, and IV were discarded). [citation needed] While the three propulsion stages were the "muscle" of the Saturn V, the Instrument Unit (IU) was the "brains." The IU was ...
The original design of the heavy-lift Ares V, named in homage to the Saturn V, was 360 feet (110 m) in height and featured a core stage based on the Space Shuttle External Tank, with a diameter of 28 feet (8.4 m). It was to be powered by five RS-25 engines and two five-segment Space Shuttle Solid Rocket Boosters (SRBs).
Saturn V-Centaur; Saturn V-D; Saturn-Shuttle; ST-124-M3 inertial platform This page was last edited on 27 December 2023, at 00:35 (UTC). Text is available under the ...
S-IC-T was planned as a test rocket only and not to be used in the later Apollo program. The Saturn V rocket was used in the Apollo program to depart Earth's gravity. S-IC-T, like all following Saturn V's S-IC rockets used five Rocketdyne F-1 engines. The Rocketdyne F-1 engine was first tested in March 1959 and delivered to NASA in October 1963.
The height from ground level to the platform is adjustable from 6.1 to 7.9 m (20 to 26 ft), and each side can be raised and lowered independently of the other. The crawler uses a laser guidance system and a leveling system to keep the Mobile Launcher Platform level within 10 minutes of arc (0.16 degrees; about 30 cm (1 ft) at the top of the ...
Ad
related to: saturn v inertial platform lift