enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Length between perpendiculars - Wikipedia

    en.wikipedia.org/wiki/Length_between_perpendiculars

    Graphical representation of the dimensions used to describe a ship. Length between perpendiculars (often abbreviated as p/p, p.p., pp, LPP, LBP or Length BPP) is the length of a ship along the summer load line from the forward surface of the stem, or main bow perpendicular member, to the after surface of the sternpost, or main stern perpendicular member.

  3. Marine thruster - Wikipedia

    en.wikipedia.org/wiki/Marine_thruster

    Repairs being performed on the bow thruster of the Bro Elizabeth. Positioning thrusters come in applications, Bow thrusters at the forward end of the vessel, and stern thrusters mounted aft on the boat. Their purpose is to maneuver or position the boat to a greater precision than the propulsion device can accomplish.

  4. Maneuvering thruster - Wikipedia

    en.wikipedia.org/wiki/Maneuvering_thruster

    Instead of a tunnel thruster, boats from 30 to 80 feet (9 to 24 m) in length may have an externally mounted bow thruster. As its name suggests, an external bow thruster is attached to the bow , making it suitable for boats where it is impossible or undesirable to install a tunnel thruster, due to hull shape or outfitting.

  5. Hull (watercraft) - Wikipedia

    en.wikipedia.org/wiki/Hull_(watercraft)

    Length between perpendiculars (LBP or LPP) is the length of the summer load waterline from the stern post to the point where it crosses the stem. (see also p/p) Length overall (LOA) is the extreme length from one end to the other. Moulded depth (D) is the vertical distance measured from the top of the keel to the underside of the upper deck at ...

  6. Length overall - Wikipedia

    en.wikipedia.org/wiki/Length_overall

    Length overall (LOA, o/a, o.a. or oa) is the maximum length of a vessel's hull measured parallel to the waterline. This length is important while docking the ship. This length is important while docking the ship.

  7. Waterline length - Wikipedia

    en.wikipedia.org/wiki/Waterline_length

    A vessel's length at the waterline (abbreviated to L.W.L) [1] is the length of a ship or boat at the level where it sits in the water (the waterline). The LWL will be shorter than the length of the boat overall (length overall or LOA) as most boats have bows and stern protrusions that make the LOA greater than the LWL. As a ship becomes more ...

  8. Stuffing box - Wikipedia

    en.wikipedia.org/wiki/Stuffing_box

    A special purpose heavy-duty rubber hose attaches the stuffing box to a stern tube, also called a shaft log, that projects inward from the hull. Marine-duty hose clamps secure the hose to the stern tube and the aft portion of the stuffing box sleeve. A sound stuffing box installation is critical to safety because failure can admit a ...

  9. Bow (watercraft) - Wikipedia

    en.wikipedia.org/wiki/Bow_(watercraft)

    On slower ships like tankers and barges, a fuller bow shape is used to maximise the volume of the ship for a given length. The bow may be reinforced to serve as an ice-breaker. [4] The forward part of the bow is called the "stem" or "forestem". Traditionally, the stem was a timber (or metal) post into which side planks (or plates) were joined.