Search results
Results from the WOW.Com Content Network
The 28.6-kilometer (17.8 mi)-long Airport Rail Link opened for service on 23 August 2010. [2] In the future, Airport Rail Link will extends from Phaya Thai towards Krung Thep Aphiwat Central Terminal and Don Mueang International Airport. Its rail will also be used for the proposed Don Mueang–Suvarnabhumi–U-Tapao high-speed railway.
Airport rail link; Airport Rail Link: Don Mueang–Suvarnabhumi–U-Tapao high-speed railway (Phaya Thai to Don Mueang section) TBA: Phaya Thai: Don Mueang: 20.31 km (12.62 mi) 2 Approved State Railway of Thailand: Rapid Transit; Sukhumvit Line: Lam Luk Ka Extension TBA: Khu Khot: Eastern Ring Road Lam Luk Ka 7.8 km (4.8 mi) 4 Postponed
100 km (62 [2].2 mi) 63 BTSC under concession from BMA: MRT: 2004 4 135.9 km (84.4 mi) 107 BEM (Blue Line and Purple Line) Eastern Bangkok Monorail (Yellow Line) under concession from MRTA Northern Bangkok Monorail (Pink Line) under concession from MRTA. Airport Rail Link: 2010 1 28.6 km (17.8 mi) 8 Asia Era One under concession from SRT [3 ...
Ratchaprarop Station (Thai: สถานีราชปรารภ) is an Airport Rail Link station on the Ratchaprarop Road. [1] In the future, it will become an interchange station for the MRT Orange Line following the opening of the western extension in 2030. [2] [3] The station serves the Pratunam area.
Suvarnabhumi Station (Thai: สถานีสุวรรณภูมิ, RTGS: Sathani Suwannaphum) is a rapid transit station on the Airport Rail Link. It serves the Suvarnabhumi Airport, Thailand, and is integrated with the passenger terminal. The station was opened in August 2010. It is also the easternmost rapid transit station in Bangkok ...
The following lists the stations of all urban rail transit systems in Bangkok and the surrounding Bangkok Metropolitan Region, including the BTS, MRT, Airport Rail Link and SRT Red Lines. It does not include the 12 stations of the Bangkok BRT. The table below lists 192 stations in operation, comprising: 47 stations on the BTS Sukhumvit Line
The Airport Rail Link, opened in August 2010, connects the city centre to Suvarnabhumi Airport to the east. Its eight stations span a distance of 28 kilometres (17 mi). The SRT Red Lines opened in 2021 and add 41km of track with commuter services connected to the new rail hub at Krung Thep Aphiwat Central Terminal .
It opened on 28 September 2023 (the airport’s 17th anniversary) as part of the partial opening of Suvarnabhumi Airport Midfield Satellite Concourse 1 (SAT-1) and connects the main terminal with SAT-1. It is the only airport people mover system in Thailand and is 1 km in length. [1]