Search results
Results from the WOW.Com Content Network
MRT and BTS: 80 km/h (50 mph) ARL and SRT: 160 km/h (99 mph) The Mass Rapid Transit Master Plan in Bangkok Metropolitan Region , or M-Map , is the latest version in a series of Thai government plans for the development of an urban rail transit network serving the Greater Bangkok area.
The BTS Skytrain Map of Bangkok urban transit systems. Bangkok Metropolitan Region is served by 9 rapid transit rail lines as of 2023. The BTS Skytrain consists of three lines, the Sukhumvit Line, Silom Line and Gold Line. The Metropolitan Rapid Transit (MRT) also consists of three lines, the Blue Line, Purple Line and Yellow Line.
Along with the BTS Skytrain and the Airport Rail Link, the MRT is part of Bangkok's rail transportation infrastructure. The BEM-operated MRT lines have 526,000 passengers each day as of August 2024 (Blue Line 453,000 and Purple Line 73,000) with 54 operational stations and a combined route length of 71 kilometers (44 mi). [ 4 ]
Color on map Light Green: Service; Type: Rapid transit: System: BTS Skytrain: Operator(s) Bangkok Mass Transit System Public Company Limited: Depot(s) Mo Chit Depot (shared with BTS ) Khu Khot Depot (shared with BTS ) Kheha Depot: Rolling stock: Siemens Modular Metro EMU-A1: 35 four-car trains Siemens Bozankaya EMU-A2: 22 four-car trains
The following lists the stations of all urban rail transit systems in Bangkok and the surrounding Bangkok Metropolitan Region, including the BTS, MRT, Airport Rail Link and SRT Red Lines. It does not include the 12 stations of the Bangkok BRT .
The line links 6 other lines; the MRT Blue Line, interchange with the MRT Orange Line (which is under construction), the planned MRT Grey Line and MRT Brown Line, the Airport Rail Link (Bangkok) and finally the BTS Sukhumvit Line. As such, it is an important cross city link in the middle north-eastern and eastern areas of Bangkok.
The Gold Line is an automated people mover line, part of Bangkok's rapid transit system. The line is 1.8 km (1.1 mi) long, consisting of 3 stations, [2] and was opened by Thai Prime Minister Prayut Chan-o-cha on 16 December 2020. [3]
Instead of turning left at the Silom-Naradhiwas junction, the line went straight. After exiting BTS S4 station, the line turned left at the Surasak junction, then right at the Sathorn-Surasak junction, continuing for 500 meters and terminating at BTS S5 station. The depot for both lines was initially located at Lumphini Park.