Project Cost Management (PCM) is the dimension of project management which aims to ensure that a project is completed within its approved budget. [1] [2] It encompasses several specific project management activities including estimating, job controls, field data collection, scheduling, accounting and design, and uses technology to measure cost and productivity through the full life-cycle of ...
Data warehouse automation (DWA) refers to the process of accelerating and automating the data warehouse development cycles, while assuring quality and consistency. DWA is believed to provide automation of the entire lifecycle of a data warehouse, from source system analysis to testing to documentation .
Basis of estimate (BOE) is a tool used in the field of project management by which members of the project team, usually estimators, project managers, or cost analysts, calculate the total cost of the project.
In project management (e.g., for engineering), accurate estimates are the basis of sound project planning. Many processes have been developed to aid engineers in making accurate estimates, such as Analogy based estimation; Compartmentalization (i.e., breakdown of tasks) Cost estimate; Delphi method; Documenting estimation results; Educated ...
Critical path drag is a project management metric used to schedule analysis and compression in the critical path method of scheduling. Drag cost is the reduction in the expected return on investment for a project due to an activity's or constraint's critical path drag. It is often used to justify additional resources that cost less than the ...
A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. A cost ...
Cost estimation models are mathematical algorithms or parametric equations used to estimate the costs of a product or project. The results of the models are typically necessary to obtain approval to proceed, and are factored into business plans, budgets, and other financial planning and tracking mechanisms.
The cost database may be stored in relational database management system, which may be in either an open or proprietary format, serving the data to the cost estimating software. The cost database may be hosted in the cloud. Estimators use a cost database to store data in structured way which is easy to manage and retrieve. [2]