Search results
Results from the WOW.Com Content Network
The water-water energetic reactor (WWER), [1] or VVER (from Russian: водо-водяной энергетический реактор; transliterates as vodo-vodyanoi enyergeticheskiy reaktor; water-water power reactor) is a series of pressurized water reactor designs originally developed in the Soviet Union, and now Russia, by OKB Gidropress. [2]
List of free analog and digital electronic circuit simulators, available for Windows, macOS, Linux, and comparing against UC Berkeley SPICE. The following table is split into two groups based on whether it has a graphical visual interface or not.
The AP1000 design traces its history to two previous designs, the AP600 and the System 80.. The System 80 design was created by Combustion Engineering and featured a two-loop cooling system with a single steam generator paired with two reactor coolant pumps in each loop that makes it simpler and less expensive than systems which pair a single reactor coolant pump with a steam generator in each ...
The corresponding technical solutions guarantee that reactor plant will be transferred to safe conditions at any combination of initial events (natural and human-induced) triggering to loss of all the electric power sources. This fact increases considerably the project competitiveness both in foreign and domestic markets of electric power ...
The free tours begin and end at the visitor center at 2000 Logston Blvd., Richland, Wash., and include 45-minute bus rides to and from the reactor. About two hours is spent at the reactor.
DRAGON 3.05D, Reactor Cell Calculation System with Burnup nesc0784 DSNP, Program and Data Library System for Dynamic Simulation of Nuclear Power Plant nea-1683 ERANOS 2.3N, Modular code and data system for fast reactor neutronics analyses nea-1916 FINPSA TRAINING 2.2.0.1 -R-, a PSA model in consisting of event trees, fault trees, and cut sets
A: So the reactor is fueled, the reactor is closed, bolted shut. Control rods are slowly being pulled out. The control rods absorb neutrons without undergoing any nuclear reactions.
Reactor Status Capacity in MWe Construction start First criticality Grid Connection Commercial operation Closure Notes Type Model Net Gross I 1 PWR: VVER-1000: Operational 917: 1000 31 March 2002 13 July 2013 22 October 2013 31 December 2014 — [35] 2 PWR: VVER-1000: Operational 917: 1000 4 July 2002 10 July 2016 29 August 2016 31 March 2017 ...