On 28 May, the temporary seawater cooling pump for Reactor 5 stopped, which was discovered by TEPCO at 21 local time. At that time, the temperature in the reactor was 68 °C, and in the spent fuel pool 41 °C. [90] At 11 in the morning the following day the temperatures had risen to 92.2 °C and 45.7 °C. [91] Cooling was restored at 12:49 pm. [92]
Multipurpose Constor Storage, Transport, and Disposal Cask A centralized storage facility using dry casks is located at Ahaus . [ 18 ] As of 2011, it housed 311 casks: 305 from the Thorium High Temperature Reactor , 3 from the Neckarwestheim Nuclear Power Plant , and 3 from the Gundremmingen Nuclear Power Plant . [ 18 ]
The progenitor of the BWR line was the 5 MW Vallecitos Boiling Water Reactor (VBWR), brought online in October 1957. Six design iterations, BWR-1 through BWR-6, were introduced between 1955 and 1972. This was followed by the Advanced Boiling Water Reactor (ABWR) introduced in the 1990s and the Economic Simplified Boiling Water Reactor (ESBWR ...
Unit 6 also shortly began on 1 July 1983. Unit 5 was scheduled to become operational on 7 November 1986, and reactor 6 in 1994 inside a new block of buildings. [3] The two RBMK-1000 units measured 11.8 m (39 ft) tall and 7 m (23 ft) in diameter, and were installed with two large portal cranes. [4]
The structure weighs over 30,000 tons and completely covers Reactor number 4. This new tomb is designed to last over 100 years, and has special ventilation and temperature systems to prevent condensation of radioactive fluids on the inside which could result in a compromised containment.
The commission, composed of fifteen members, conducted an extensive two-year study of nuclear waste disposal, what is referred to as the "back end" of the nuclear energy process. [94] The commission established three subcommittees: Reactor and Fuel Cycle Technology, Transportation and Storage, and Disposal. [94]
A BWR's containment consists of a drywell, where the reactor and associated cooling equipment is located, and a wetwell. The drywell is much smaller than a PWR containment and plays a larger role. During the theoretical leakage design basis accident, the reactor coolant flashes to steam in the drywell, pressurizing it rapidly.
They are typically 40 or more feet (12 m) deep, with the bottom 14 feet (4.3 m) equipped with storage racks designed to hold fuel assemblies removed from reactors. A reactor's local pool is specially designed for the reactor in which the fuel was used and is situated at the reactor site. Such pools are used for short-term cooling of the fuel rods.