Search results
Results from the WOW.Com Content Network
When correctly placed, blocking also provides grounds (also backing or back blocking) for supporting the cut ends of wall claddings and linings or for attaching items such as cabinets, shelving, handrails, vanity tops and backsplashes, towel bars, decorative mouldings, etc. Properly placed grounds make the second fixings easier once the walls ...
Strut is normally made of sheet steel, with a zinc coating (), paint, epoxy, powder coat, or other finish.. Strut channel is also manufactured from stainless steel for use where rusting might become a problem (e.g., outdoors, facilities with corrosive materials), from aluminium alloy when weight is an issue or from fiberglass for very corrosive environments.
The main function of an OWSJ is to provide direct support for roof or floor deck and to transfer the load imposed on the deck to the structural frame i.e. beam and column. In order to accurately design an OWSJ, engineers consider the joist span between bearing points, joist spacing, slope, live loads , dead loads , collateral loads, seismic ...
A pipe support or pipe hanger is a designed element that transfer the load from a pipe to the supporting structures. The load includes the weight of the pipe proper, the content that the pipe carries, all the pipe fittings attached to pipe, and the pipe covering such as insulation. The four main functions of a pipe support are to anchor, guide ...
Attempts have been made to increase the safety of bridges with pin and hanger assemblies by adding some form of redundancy to the assembly. Retrofits that add redundancy to pin and hanger assemblies include adding a "catcher's mitt"—a short steel beam attached to the bottom of the cantilevered girder that extends out beneath the suspended girder to "catch" the suspended girder should ...
Clevis hanger. A clevis hanger consists of one U-shaped clevis and a second V-shaped clevis with a hole in a flattened section at the base of the V, joined together with a bolt or pin. Clevis hangers are used as a pipe attachment providing vertical adjustment for pipes. [5]
Assembling the HESCO unit entails unfolding it and filling it with sand, soil or gravel, usually using a front end loader.The placement of the barrier is generally very similar to the placement of a sandbag barrier or earth berm except that room must generally be allowed for the equipment used to fill the barrier.
This is the simplest arrangement of masonry units. If the wall is two wythes thick, one header is used to bind the two wythes together. [3] Header course: This is a course made up of a row of headers. [1] Bond course: This is a course of headers that bond the facing masonry to the backing masonry. [1] Plinth: The bottom course of a wall.