Search results
Results from the WOW.Com Content Network
The gas-lift mandrel is a device installed in the tubing string of a gas-lift well onto which or into which a gas-lift valve is fitted. There are two common types of mandrels. In a conventional gas-lift mandrel, a gas-lift valve is installed as the tubing is placed in the well. Thus, to replace or repair the valve, the tubing string must be pulled.
Casing Diameters of a Borehole Casing Diagram premium gas tight connections on a casing string. Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream.
This calculation is at sea level at 0 °C. For higher altitudes, or higher temperatures, the amount of lift will decrease proportionally to the air density, but the ratio of the lifting capability of hydrogen to that of helium will remain the same. This calculation does not include the mass of the envelope need to hold the lifting gas.
Petroleum production engineers design and select subsurface equipment to produce oil and gas well fluids. [1] They often are degreed as petroleum engineers, although they may come from other technical disciplines (e.g., mechanical engineering, chemical engineering, physicist) and subsequently be trained by an oil and gas company.
Valve lift can be expressed as an actual dimension in decimal inches or mm. It can also be specified as a ratio between a characteristic diameter and the lift L/D. Most often used is the valve head diameter. Normally engines have an L/D ratio from 0 up to a maximum of 0.35. For example, a 1-inch-diameter (25 mm) valve would be lifted a maximum ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
(The compressor is on the surface and no mechanical parts are needed in the well). However airlift wells must be much deeper than the water table to allow for submergence. Air is generally pumped at least as deep under the water as the water is to be lifted. (If the water table is 50 ft below, the air should be pumped 100 feet deep).
Gas initially in place (GIIP) or original gas in place (OGIP) denote the total estimated quantity (volume) of natural gas contained in a "subsurface" asset prior to extraction . [ 1 ] Gas Initially In Place = Gross Rock Volume * Net/Gross * Porosity * average initial Gas Saturation / Formation Volume Factor [ 2 ]