enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Working load limit - Wikipedia

    en.wikipedia.org/wiki/Minimum_breaking_strength

    It is a calculation of the Minimum Breaking Strength (MBS) also known as Minimum Breaking Load (MBL) divided by a safety factor, usually ranging from 4 to 6 on lifting equipment. The factor can be as high as 10:1 or 10 to 1, if the equipment poses a risk to a person's life.

  3. Manual handling of loads - Wikipedia

    en.wikipedia.org/wiki/Manual_handling_of_loads

    The NIOSH lifting equation is a tool (now application) that can be used by health and safety professionals to assess employees who are exposed to manual lifting or handling of materials. [7] The NIOSH lifting equation is a mathematical calculation which calculates the Recommended Weight Limit (RWL) using a series of tables, variables, and ...

  4. Lifting Operations and Lifting Equipment Regulations 1998

    en.wikipedia.org/wiki/Lifting_Operations_and...

    The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are set of regulations created under the Health and Safety at Work etc. Act 1974 which came into force in Great Britain on 5 December 1998 [1] and replaced a number of other pieces of legislation which previously covered the use of lifting equipment.

  5. Lifting equipment - Wikipedia

    en.wikipedia.org/wiki/Lifting_equipment

    Lifting equipment, also known as lifting gear, is a general term for any equipment that can be used to lift and lower loads. [1] Types of lifting equipment include heavy machinery such as the patient lift , overhead cranes , forklifts , jacks , building cradles, and passenger lifts, and can also include smaller accessories such as chains ...

  6. Ergonomics for manual material handling - Wikipedia

    en.wikipedia.org/wiki/Ergonomics_for_Manual...

    The National Institute of Occupational Safety and Health (NIOSH) lifting equation (1994) [1] provides guidelines for evaluating two-handed manual lifting tasks. It defines a Recommended Weight Limit (RWL) as the weight of the load that nearly all healthy workers can lift over a substantial period of time (e.g., eight hours) without an increased ...

  7. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    F/n = 23 kN per anchor during site lifting (n = 2 lifting anchors) Reference to the load capacity tables provided by the anchor manufacturer is required to make an anchor selection for the specific concrete strengths at the time of lifting. Hence the great of the two calculated anchor capacities required at the concrete strength of the initial ...

  8. Design load - Wikipedia

    en.wikipedia.org/wiki/Design_load

    A crane's rated load is its Safe Working Load (SWL) and the design load (DL) is, (p 90) [1] = The dynamic lift factor for offshore cranes in the range 10 kN < SWL ≤ 2500 kN is not less than =.(p 84) [1] Thus for a crane with a SWL of 2000 kN (~200 tonne) its design load is not less than, = = The minimum breaking load (MBL) for the combined capacity of reeves of a steel wire hoisting rope ...

  9. Drivers' working hours - Wikipedia

    en.wikipedia.org/wiki/Drivers'_working_hours

    The cumulative driving time without taking a break must not exceed 4.5 hours. Before surpassing 4.5 hours of cumulated driving time, the driver must take a break period of at least 45 minutes. However, this can be split into 2 breaks, the first being at least 15 minutes, and the second being at least 30 minutes in length. The daily driving time ...