The $600 million mixed-use development spans 1.5 million square feet and is located on three-acres of land.[5] One Seaport is the largest mixed-use project in the City of Boston in thirty years. The project is led by three Boston-based companies Berkshire Group, WS Development, and Boston Global Investors.
The South Boston Waterfront area is part of the Port of Boston on Boston Harbor. In September 2010, the Seaport Square project was under planning. It was expected to cost $3 billion and replace parking lots between the federal courthouse and convention center with a 6,300,000-square-foot (590,000 m 2) mixed-use development. Construction was ...
The Metlo Boston (also 399 Congress Street) is a tower in the Seaport area of Boston, Massachusetts. [2] The 22-story mixed-use tower is located adjacent to East Service Road, Congress Street and Boston Wharf Road. The tower has 414 apartment residences, and approximately 2,550 square feet of ground-floor retail.
Total project cost was estimated as $850 million ($740 million for construction including 30% contingency, $50 million for design, $30 million in administration costs, and $30 million for additional rolling stock), with construction lasting from 2025 to 2030. [29] [30] A Notice of Project Change (NPC) was issued on October 2, 2023. [31]
The Coastal Cement facility in the Boston marine industrial park Also located on the site is the extensive Coastal Cement Corporation facility, designed by HMFH Architects . Completed in 1989, the facility spans 14,000 square feet with four silos that reach 120 feet and collectively store 41,000 tons of cement.
A map of Boston Harbor from 1888. Before the colonization of the Americas, the area served as a trading post for Native Americans in the region. [citation needed] After the establishment of the Boston settlement by John Winthrop in 1630 and the creation of a local shipbuilding industry, the port served the rapidly expanding American colonies.
South Station Tower is a skyscraper under construction in Boston, Massachusetts, the high-rise portion of a three-building development.Construction on Phase 1 of the project, a 51-story, 678-foot tower with offices and condominiums, started in January 2020 and is expected to take four years. [2]
The station has headhouses on the north and south sides of Seaport Boulevard. The south headhouse was closed from October 5, 2015 until October 2016 due to construction of a hotel partially over the headhouse. [8] SL3 service (a new South Station–Chelsea route different from the discontinued City Point route) at the station began on April 21 ...