In 2002, the Renewables Obligation (Scotland) legislation was introduced. It was conceived as a way to promote the development of small-scale hydro-electric, wave power, tidal power, photovoltaics, wind power and biomass schemes, but by the time it came into force, the definition of small scale had been increased from 5 MW to 10 MW and then 20 MW, and existing hydro-electric stations that had ...
As of July 2010, there were 100 operating wind farms in Scotland with a combined capacity of 8 GW; and a further 96 projects under construction or consented, with capacity of 2 GW. [1] A number of other power plants include experimental wave power and tidal power generators, and Steven's Croft near Lockerbie which is the UK's largest wood-fired ...
Storr Lochs is a hydro-electric power station built on the Isle of Skye, Inner Hebrides, Scotland and commissioned in 1952. It was built by the North of Scotland Hydro-Electric Board, and used water from Lochs Leathan and Fada, to provide the first general supply of electricity to the island. Because the location of the turbine house was not ...
The scheme was the North of Scotland Hydro-Electric Board's Constructional Scheme no.20, and the order to authorise it was laid before Parliament and signed on 8 March 1949. [14] The scheme was commissioned in 1955. [15] In early 1957, Lord Lucas of Chilworth asked questions in the House of Lords about the costs of Scottish hydro-electricity.
The Shira Hydro-Electric Scheme is a project initiated by the North of Scotland Hydro-Electric Board to use the waters of the River Shira, the River Fyne and other small streams to generate hydroelectricity. It is located between Loch Fyne and Loch Awe in Argyll and Bute, western Scotland. It consists of three power stations and three ...
[5] [6] At the peak of the construction, there were around 4,000 people working on the project. [7] Thirty-six men died in the construction of the power station and dam. [8] The cost of the scheme was £24.5 million. [7] Cruachan was one of the first reversible pumped-storage systems, where the same turbines are used as both pumps and ...
In 2002, the Renewables Obligation (Scotland) legislation was introduced. It was conceived as a way to promote the development of small-scale hydro-electric, wave power, tidal power, photovoltaics, wind power and biomas schemes, but by the time it came into force, the definition of small scale had been increased from 5 MW to 10 MW and then 20 MW, and existing hydro-electric stations that had ...
However, a hydro-electric scheme was acceptable to the planning authority, as it has a much lower visual impact. In 2008 the estate approached SSE plc, the local energy supplier, for permission to connect one of four possible schemes to the National Grid, and began a project to collect flow data from the rivers. By the end of 2009, they had an ...