Search results
Results from the WOW.Com Content Network
A team of riggers design and install the lifting or rolling equipment needed to raise, roll, slide or lift objects such as heavy machinery, structural components, building materials, or large-scale fixtures with a crane, hoist or block and tackle. Rigging comes from rig, to set up or prepare.
A block and tackle [1] [2] or only tackle [3] is a system of two or more pulleys with a rope or cable threaded between them, usually used to lift heavy loads.. The pulleys are assembled to form blocks and then blocks are paired so that one is fixed and one moves with the load.
The systematic layout planning (SLP) - also referred to as site layout planning [1] - is a tool used to arrange a workplace in a plant by locating areas with high frequency and logical relationships close to each other. [2] The process permits the quickest material flow in processing the product at the lowest cost and least amount of handling ...
The configuration (size, position and quantity) of this reinforcement should be supplemented to the element reinforcement design to ensure for adequate capacity of the lifting design. Lifting design is influenced by the steel / concrete interaction of the specific anchor selected. Different load cases are considered by the lifting design ...
A block and tackle is an assembly of a rope and pulleys that is used to lift loads. A number of pulleys are assembled together to form the blocks, one that is fixed and one that moves with the load. The rope is threaded through the pulleys to provide mechanical advantage that amplifies that force applied to the rope. [4]
A drawing the intended locations of plant items and service routes in such detail as to indicate the design intent. The main features of detailed design drawings should be as follows: Plan layouts to a scale of at least 1:100. Plant areas to a scale of at least 1:50 and accompanied by cross-sections.
Israel and Lebanon have accepted a proposal to end the 13-month border conflict that spiraled into an all-out war with Hezbollah. Here are the details about the Israel-Hezbollah ceasefire deal
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...