Search results
Results from the WOW.Com Content Network
A stormwater fee is a charge imposed on real estate owners for pollution in stormwater drainage from impervious surface runoff.. This system imposes a tax that is proportional to the total impervious area on a particular property, including concrete or asphalt driveways and roofs, that do not allow rain to infiltrate.
The property tax most citizens are aware of is known as an ad valorem tax. This tax is used to fund general or day-to-day government operations. An ad valorem tax is commonly levied on both real and personal property. A property tax is based upon a property's market value.
Storm water is typically channeled to a retention basin through a system of street and/or parking lot storm drains, and a network of drain channels or underground pipes.. The basins are designed to allow relatively large flows of water to enter, but discharges to receiving waters are limited by outlet structures that function only during very large storm eve
Storm drain grate on a street in Warsaw, Poland Storm drain with its pipe visible beneath it due to construction work. A storm drain, storm sewer (United Kingdom, U.S. and Canada), highway drain, [1] surface water drain/sewer (United Kingdom), or stormwater drain (Australia and New Zealand) is infrastructure designed to drain excess rain and ground water from impervious surfaces such as paved ...
Pervious concrete, also called "porous pavement", similar to Permeable paving; Grassed swales, also known as bioswales. [12] Commercially manufactured stormwater management devices that capture pollutants (e.g., media filters) and/or aid in on-site infiltration. Tree pits [13]
For premium support please call: 800-290-4726 more ways to reach us
The Environmental Protection Agency decreed in 2010 that Maryland had to stop so much stormwater runoff from draining into the Bay, a project that would cost $14.8 billion.
The Stormwater Pollution Prevention Plan, often abbreviated as SWPPP or SW3P, is a plan created by constructors to show their plans for sediment and erosion control. [1] Typically these plans are part of an overall design that details procedures to be followed during various phases of construction.