enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Submittals (construction) - Wikipedia

    en.wikipedia.org/wiki/Submittals_(construction)

    The product data submittal usually consists of the manufacturer's product information. The information included in this submittal are: Manufacturer, trade name, model or type number and quantities: This information is necessary to compare the submitted item with the specified products and acceptable products listed, in the specification and addenda.

  3. Shop drawing - Wikipedia

    en.wikipedia.org/wiki/Shop_drawing

    It is extremely important that the fabricated item arrive on the jobsite ready to be installed without field modification. Special care must be taken by the contractor to measure and verify dimensions. In new construction, plan dimensions usually are sufficient for ordering many fabricated items such as structural steel or precast concrete. [2]

  4. Commissioning (construction) - Wikipedia

    en.wikipedia.org/wiki/Commissioning_(construction)

    The systems, equipment, items, processes, modes, and sequences of operations to be tested by the CxP (contractors or others) should be detailed and identified in the design engineer's construction documents (drawings and specifications), the construction request for proposal (RFP), the contractors' bid submission, the commissioning ...

  5. 16 Divisions - Wikipedia

    en.wikipedia.org/wiki/16_Divisions

    The 16 Divisions of construction, as defined by the Construction Specifications Institute (CSI)'s MasterFormat, is the most widely used standard for organizing specifications and other written information for commercial and institutional building projects in the U.S. and Canada.

  6. Specification (technical standard) - Wikipedia

    en.wikipedia.org/wiki/Specification_(technical...

    The original listing of specification divisions was based on the time sequence of construction, working from exterior to interior, and this logic is still somewhat followed as new materials and systems make their way into the construction process. Each section is subdivided into three distinct parts: "general", "products" and "execution".

  7. Design–build - Wikipedia

    en.wikipedia.org/wiki/Design–build

    Establish a construction company as a separate corporation that signs a separate construction contract, so they are able to insure and simplify liability insurance coverage; Either they have, or are able to acquire, the skills of a design–builder; Recognize the parties' different incentives

  8. Construction management - Wikipedia

    en.wikipedia.org/wiki/Construction_management

    Construction cost management is a fee-based service in which the construction manager (CM) is responsible exclusively to the owner, acting in the owner's interests at every stage of the project. The construction manager offers impartial advice on matters such as: Optimum use of available funds; Control of the scope of the work; Project scheduling

  9. Construction bidding - Wikipedia

    en.wikipedia.org/wiki/Construction_bidding

    Bid solicitation is the process of making published construction data readily available to interested parties, including construction managers, contractors, and the public. There are several services, including government entities and private plan rooms, that allow project owners to release project details to solicit and obtain contractor bids.