enow.com Web Search

  1. Ad

    related to: load calculation for crane lifting services near me

Search results

  1. Results from the WOW.Com Content Network
  2. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    F/n = 23 kN per anchor during initial lift (n = 2 lifting anchors) Transport loads in the yard and on-site Suction due to casting bed adhesion is not considered, as the calculation takes into account the lifting device dynamic coefficient. S = (W x Ksl x Kd) / n = (64.8 x 1.16 x 1.2) / 2 = 45.1 kN load resistance required per anchor

  3. Lifting equipment - Wikipedia

    en.wikipedia.org/wiki/Lifting_equipment

    Lifting equipment, also known as lifting gear, is a general term for any equipment that can be used to lift and lower loads. [1] Types of lifting equipment include heavy machinery such as the patient lift , overhead cranes , forklifts , jacks , building cradles, and passenger lifts, and can also include smaller accessories such as chains ...

  4. Lifting beam - Wikipedia

    en.wikipedia.org/wiki/Lifting_beam

    Rigging of an asymmetrical scaffolding piece: the lifting beam is blue, the load is attached to the beam using grey slings. The lifting beam (also known as traverse, spreader beam) is a steel beam that is attached to the hook of the crane in order to spread the slings from one end of an elongated load (like a wall panel) to another.

  5. Factor of safety - Wikipedia

    en.wikipedia.org/wiki/Factor_of_safety

    In engineering, a factor of safety (FoS) or safety factor (SF) expresses how much stronger a system is than it needs to be for an intended load.Safety factors are often calculated using detailed analysis because comprehensive testing is impractical on many projects, such as bridges and buildings, but the structure's ability to carry a load must be determined to a reasonable accuracy.

  6. Oversize load: Delays expected as 'super load' trucks bring ...

    www.aol.com/oversize-load-delays-expected-super...

    For premium support please call: 800-290-4726 more ways to reach us

  7. Rigging (material handling) - Wikipedia

    en.wikipedia.org/wiki/Rigging_(material_handling)

    Rigging is the equipment such as wire rope, turnbuckles, clevis, jacks used with cranes and other lifting equipment [1] in material handling and structure relocation. Rigging systems commonly include shackles, master links and slings, and lifting bags in underwater lifting.

  8. Crane (machine) - Wikipedia

    en.wikipedia.org/wiki/Crane_(machine)

    It accounts for the dynamic effects that can increase the load on a crane's structure and components during lifting operations. These effects include: Hoisting acceleration and deceleration of the load, which is a significant factor; Crane movement such as slewing or luffing; Load swinging; Wind forces acting on the crane, the load and the ...

  9. Overhead crane - Wikipedia

    en.wikipedia.org/wiki/Overhead_crane

    Giant cranes such as this one are being used to build the world's longest wind turbines. Example of an overhead crane being used to lift heavy rolls. In many instances, the cost of a bridge crane can be largely offset with savings from not renting mobile cranes in the construction of a facility that uses a lot of heavy processing equipment.

  1. Ad

    related to: load calculation for crane lifting services near me