enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Timeline of the Deepwater Horizon oil spill - Wikipedia

    en.wikipedia.org/wiki/Timeline_of_the_Deepwater...

    May 21 – BP begins live underwater video broadcasts of the leak. [64] Flow Rate Technical Group established for "scientifically validated information about the amount of oil flowing from BP s leaking oil well." [26] The average daily oil collection rates is 2,000 barrels (84,000 US gallons; 320,000 litres) a day. [65] [66]

  3. Well test (oil and gas) - Wikipedia

    en.wikipedia.org/wiki/Well_test_(oil_and_gas)

    Regularly, for example once a month per well, the flow from one and only one selected well is led into the test separator for determining well flow rate for the selected well. [3] The separator divides the flow from the well into the streams of individual products which typically are oil, gas and water, but may include natural-gas condensate ...

  4. Leak detection - Wikipedia

    en.wikipedia.org/wiki/Leak_detection

    A leak appearing within an analytic region (a rule added to the camera) is immediately analyzed for its attributes, including thermal temperature, size, and behaviour (e.g. spraying, pooling, spilling). When a leak is determined to be valid based on set parameters, an alarm notification with leak video is generated and sent to a monitoring station.

  5. Efforts to stem the Deepwater Horizon oil spill - Wikipedia

    en.wikipedia.org/wiki/Efforts_to_stem_the...

    [7] [8] The second technique, placing a 125-tonne (276,000 lb) containment dome (which had worked on leaks in shallower water) over the largest leak and piping the oil to a storage vessel on the surface, failed when gas leaking from the pipe combined with cold water formed methane hydrate crystals that blocked the opening at the top of the dome ...

  6. Oil well control - Wikipedia

    en.wikipedia.org/wiki/Oil_well_control

    Shut-in drill pipe pressure (SIDPP), which is recorded when a well is shut in on a kick, is a measure of the difference between the pressure at the bottom of the hole and the hydrostatic pressure (HSP) in the drillpipe. During a well shut-in, the pressure of the wellbore stabilizes, and the formation pressure equals the pressure at the bottom ...

  7. Completion (oil and gas wells) - Wikipedia

    en.wikipedia.org/wiki/Completion_(oil_and_gas_wells)

    Gas lift well: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is lowered and the fluid is gas lifted to the surface. Single-well alternate completions: in this instance there is a well with two zones. In order to produce from both the zones are isolated with packers.

  8. Blowout (well drilling) - Wikipedia

    en.wikipedia.org/wiki/Blowout_(well_drilling)

    The Soviets lowered a specially made 30 kiloton nuclear physics package into a 6-kilometre (20,000 ft) borehole drilled 25 to 50 metres (82 to 164 ft) away from the original (rapidly leaking) well. A nuclear explosive was deemed necessary because conventional explosives both lacked the necessary power and would also require a great deal more ...

  9. Deepwater Horizon oil spill - Wikipedia

    en.wikipedia.org/wiki/Deepwater_Horizon_oil_spill

    This is an accepted version of this page This is the latest accepted revision, reviewed on 10 February 2025. Oil spill in the Gulf of Mexico This article is about the oil spill itself. For the initial explosion, see Deepwater Horizon explosion. For other related articles, see Deepwater Horizon (disambiguation). Deepwater Horizon oil spill As seen from space by the Terra satellite on 24 May ...