enow.com Web Search

  1. Ad

    related to: pouring concrete lamp post base with 3 1 4 id box

Search results

  1. Results from the WOW.Com Content Network
  2. Tremie - Wikipedia

    en.wikipedia.org/wiki/Tremie

    The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.

  3. Slip forming - Wikipedia

    en.wikipedia.org/wiki/Slip_forming

    The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.

  4. Precast concrete - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete

    The overall thickness of sandwich wall panels in commercial applications is typically 8 inches, but their designs are often customized to the application. In a typical 8-inch wall panel the concrete wythes are each 2-3/8 inches thick), sandwiching 3-1/4 inches of high R-value insulating foam. The interior and exterior wythes of concrete are ...

  5. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  6. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    Typical widths are between 6 and 10 feet (1.8 and 3.0 m), typical lengths are between 12 and 20 feet (3.7 and 6.1 m), though table sizes may vary in size and form. The major distinction of this approach is that the tables are lifted either with a crane transport fork or by material platform elevators attached to the side of the building.

  7. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  8. Caisson (engineering) - Wikipedia

    en.wikipedia.org/wiki/Caisson_(engineering)

    Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.

  9. Play Slots Lounge Online for Free - AOL.com

    www.aol.com/games/play/masque-publishing/slots...

    Free premium casino-style slots and classic video poker by the creators of authentic PC & Mac casino slots from IGT, WMS Gaming, and Bally!

  1. Ad

    related to: pouring concrete lamp post base with 3 1 4 id box