Search results
Results from the WOW.Com Content Network
The Arrowhead West Tunnel is 3.8 mi (6.1 km) long and 12 ft (3.7 m) in diameter. The tunnel begins at Devil's Canyon and is the first of the three tunnels in the feeder project. It continues east to the Waterman portal at Old Waterman Canyon Road and California State Route 18. The tunnel was constructed with a grade to allow water to flow by ...
The 25 ft (8 m) Transportable Port Security Boat (TPSB): (AKA The Guardian) is a twin outboard motor, open deck, all weather, high performance, moderately-armed platform capable of operating in inner harbor/near shore environments in light sea conditions.
VB-10,000 is a heavy-lift twin-gantry catamaran consisting of two truss space frames atop two barges.The design was derived from Versabar's earlier VB-4000 (aka Bottom Feeder), [1] [2] which was developed to clear debris from toppled oil drilling platforms in the Gulf of Mexico.
For both of these rules of thumb (85%/90% and major minus pitch), the tap drill size yielded is not necessarily the only possible one, but it is a good one for general use. The 85% and 90% rules works best in the range of 1 ⁄ 4 –1 in (6.4–25.4 mm), the sizes most important on many shop floors. Some sizes outside that range have different ...
In Houston and East Texas, they are called feeders. Dallas and Fort Worth area residents call their frontage roads "service roads", and "access roads" is the predominant term used in San Antonio. [8] Most signs reference "Frontage Road" despite local regional vernacular (there are signs in Houston that use the term "feeder").
An example of a water distribution system: a pumping station, a water tower, water mains, fire hydrants, and service lines [1] [2]. A water distribution system is a part of water supply network with components that carry potable water from a centralized treatment plant or wells to consumers to satisfy residential, commercial, industrial and fire fighting requirements.
In civil engineering, clearance refers to the difference between the loading gauge and the structure gauge in the case of railroad cars or trams, or the difference between the size of any vehicle and the width/height of doors, the width/height of an overpass or the diameter of a tunnel as well as the air draft under a bridge, the width of a lock or diameter of a tunnel in the case of watercraft.
The 2 × 25 kV autotransformer system is a split-phase electric power system which supplies 25 kV power to the trains, but transmits power at 50 kV to reduce energy losses. It should not be confused with the 50 kV system. In this system, the current is mainly carried between the overhead line and a feeder transmission line instead of the rail.