Search results
Results from the WOW.Com Content Network
Logo of Eurocode 2 An example of a concrete structure. In the Eurocode series of European standards (EN) related to construction, Eurocode 2: Design of concrete structures (abbreviated EN 1992 or, informally, EC 2) specifies technical rules for the design of concrete, reinforced concrete and prestressed concrete structures, using the limit state design philosophy.
Precast concrete is a construction product produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and maneuvered into place; examples include precast beams, and wall panels, floors, roofs, and piles.
Agent responsible (clause 6.1) (2 characters, indicating the person or organisation responsible for the layer information—manufacturer, A- architect A2 architect#2 on the same project B- building surveyors C- civil engineers E- electrical engineers F- facility engineers G- GIS engineers and land surveyors H- heating and ventilating engineers I- interior designers L- landscape architects Q ...
Like in the cast-in-place method, a metal frame is attached to the form and concrete is poured and finished in a factory atmosphere. The advantage to the pre-cast trench drain is again time savings—big time savings at the job site. Pre-cast trench drains made of a polymer concrete are also more sturdy and reliable than cast-in-place trenches.
A culvert under the Vistula river levee and a street in Warsaw. Construction or installation at a culvert site generally results in disturbance of the site's soil, stream banks, or stream bed, and can result in the occurrence of unwanted problems such as scour holes or slumping of banks adjacent to the culvert structure.
The Precast/Prestressed Concrete Institute (PCI) published the double tee load capacity calculation (load tables) for the first time in the PCI Design Handbook in 1971. The load tables use the code to identify double tee span type by using the width in feet, followed by "DT", followed by depth in inches, for example, 4DT14 is for 4-foot (1.2 m ...
An unreinforced concrete arch is technically a masonry arch that use only very small stones, that is the aggregate of the concrete, sand and gravel. Such an arch would not stand without mortar. Some modern bridges are built masonry style with precast concrete blocks, like Gladesville Bridge that has a span of 305 metres (1000 ft). These types ...
The ISO 128 replaced the previous DIN 6 standard for drawings, projections and views, which was first published in 1922 and updated in 1950 and 1968. ISO 128 itself was first published in 1982, contained 15 pages and "specified the general principles of presentation to be applied to technical drawings following the orthographic projection methods".