Search results
Results from the WOW.Com Content Network
This is the maximum depth at which a submarine is permitted to operate under normal peacetime circumstances, and is tested during sea trials.The test depth is set at two-thirds (0.66) of the design depth for United States Navy submarines, while the Royal Navy sets test depth at 4/7 (0.57) the design depth, and the German Navy sets it at exactly one-half (0.50) of design depth.
100 Pa Pressure due to direct impact of a strong breeze (~28 mph or 45 km/h) [27] [28] [31] 120 Pa Pressure from the weight of a U.S. quarter lying flat [32] [33] 133 Pa 1 torr ≈ 1 mmHg [34] ±200 Pa ~140 dB: Threshold of pain pressure level for sound where prolonged exposure may lead to hearing loss [citation needed] ±300 Pa ±0.043 psi
The Seawolf class is a class of nuclear-powered, fast attack submarines (SSN) in service with the United States Navy. The class was the intended successor to the Los Angeles class, and design work began in 1983. [10] A fleet of 29 submarines was to be built over a ten-year period, but that was reduced to 12 submarines.
U-99 had a displacement of 750 tonnes (740 long tons) when at the surface and 952 tonnes (937 long tons) while submerged. [1] She had a total length of 67.60 m (221 ft 9 in), a pressure hull length of 54.02 m (177 ft 3 in), a beam of 6.32 m (20 ft 9 in), a height of 8.25 m (27 ft 1 in), and a draught of 3.65 m (12 ft 0 in).
The submarine was designed for a maximum surface speed of 11.5 knots (21.3 km/h; 13.2 mph) and a submerged speed of 6.6 knots (12.2 km/h; 7.6 mph). When submerged, she could operate for 40 nautical miles (74 km; 46 mi) at 4.5 knots (8.3 km/h; 5.2 mph); when surfaced, she could travel 9,850 nautical miles (18,240 km; 11,340 mi) at 7 knots (13 km ...
Navantia has confirmed to the press that it has pitched an offer to sell submarines and build a submarine base and training center for the Philippine Navy. [43] [44] The submarine base specifically points to a location in Ormoc, Leyte. [45] Poland (3) The Polish Navy is planning to purchase 3 attack submarines as part of its Orka programme.
Designed burst speed in tests was 43–45 kn (49–52 mph; 80–83 km/h) for all vessels, and speeds of 41–42 kn (47–48 mph; 76–78 km/h) could be sustained. Acceleration to top speed took one minute and reversing 180 degrees at full speed took just 40 seconds.
USS S-6 (SS-111) was a second-group (S-3 or "Government") S-class submarine of the United States Navy. Her keel was laid down on 29 January 1918 by the Portsmouth Naval Shipyard . She was launched on 23 December 1919 sponsored by Ms. Eleanor Westcott; and commissioned on 17 May 1920.