Search results
Results from the WOW.Com Content Network
Across Unix-like operating systems many different configuration-file formats exist, with each application or service potentially having a unique format, but there is a strong tradition of them being in human-editable plain text, and a simple key–value pair format is common.
The Radio Resource Control (RRC) protocol is used in UMTS, LTE and 5G on the Air interface. It is a layer 3 (Network Layer) protocol used between UE and Base Station. This protocol is specified by 3GPP in TS 25.331 [2] for UMTS, in TS 36.331 [3] for LTE and in TS 38.331 [4] for 5G New Radio. RRC messages are transported via the PDCP-Protocol.
Infrastructure as code (IaC) is the process of managing and provisioning computer data center resources through machine-readable definition files, rather than physical hardware configuration or interactive configuration tools. [1]
Top level Configuration Management Activity model. Configuration management (CM) is a management process for establishing and maintaining consistency of a product's performance, functional, and physical attributes with its requirements, design, and operational information throughout its life.
In computing, a system resource, or simply resource, is any physical or virtual component of limited availability that is accessible to a computer. All connected devices and internal system components are resources. Virtual system resources include files (concretely file handles), network connections (concretely network sockets), and memory areas.
For system configuration in general see System configuration. For the Microsoft Windows System Configuration utility see MSConfig . Topics referred to by the same term
In electronic design automation, a design rule is a geometric constraint imposed on circuit board, semiconductor device, and integrated circuit (IC) designers to ensure their designs function properly, reliably, and can be produced with acceptable yield.
Storable resources remain available unless depleted by usage, and may be replenished by project tasks that produce them. Nonstorable resources must be renewed for each time period, even if not used in previous periods. [2] Resource scheduling, availability, and optimisation are considered key to successful project management.