Search results
Results from the WOW.Com Content Network
A MLS facilitates the collection of ground-water samples and measurement of hydraulic heads from many more discrete depths than can be obtained using typical well clusters or nests. A MLS facilitates the collection of subsurface head and chemical data over time, which is something that cannot be accomplished using "one-time" profiling tools ...
A leak appearing within an analytic region (a rule added to the camera) is immediately analyzed for its attributes, including thermal temperature, size, and behaviour (e.g. spraying, pooling, spilling). When a leak is determined to be valid based on set parameters, an alarm notification with leak video is generated and sent to a monitoring station.
Tank leak detection is implemented to alert the operator to a suspected release from any part of a storage tank system, what enables to prevent from soil contamination and loss of product. In many countries regulated UST are required to have an approved leak detection method so that leaks are discovered quickly and the release is stopped in time.
Static level is the level of water in the well when no water is being removed from the well by pumping. [8] Water table is the upper level of the zone of saturation, an underground surface in which the soil or rock is permanently saturated with water. [9] Well yield is the volume of water per unit time that is produced by the well from pumping. [8]
This gauge uses hoses attached to the various test cocks of the RPZD and checks to be certain that the check valve springs as well as the relief valve spring are not fouled and are working properly. There is a variety of manufacturers of these gauges, but most utilize either a three-valve or a five-valve design to test the RPZD in different ways.
A worker checking that well about an alarm was also killed. [158] October, 1998 – During heavy rainfall, the roof and sides of a Koch 50,000 barrel (2,100,000 gallon) above-ground storage tank buckled, discharging approximate 24,700 gallons of crude oil into Marcelinas Creek, which is a tributary of the San Antonio River.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
The Soviets lowered a specially made 30 kiloton nuclear physics package into a 6-kilometre (20,000 ft) borehole drilled 25 to 50 metres (82 to 164 ft) away from the original (rapidly leaking) well. A nuclear explosive was deemed necessary because conventional explosives both lacked the necessary power and would also require a great deal more ...