Search results
Results from the WOW.Com Content Network
In engineering, the Moody chart or Moody diagram (also Stanton diagram) is a graph in non-dimensional form that relates the Darcy–Weisbach friction factor f D, Reynolds number Re, and surface roughness for fully developed flow in a circular pipe. It can be used to predict pressure drop or flow rate down such a pipe.
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.
Cement-mortar lined ductile iron pipe is a ductile iron pipe with cement lining on the inside surface, and is commonly used for water distribution. Cement-mortar lined ductile iron pipe is governed by standards set forth by DIPRA ( Ductile Iron Pipe Research Association ), and was first used in 1922 in Charleston, South Carolina .
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place ...
When the pipes have certain roughness <, this factor must be taken in account when the Fanning friction factor is calculated. The relationship between pipe roughness and Fanning friction factor was developed by Haaland (1983) under flow conditions of 4 ⋅ 10 4 < R e < 10 7 {\displaystyle 4\centerdot 10^{4}<Re<10^{7}}
The energy consumed in manufacturing ductile iron pipe was 19.55 MJ per kg and volume of emissions released during manufacture was 1.430 kg CO 2 per kg, compared to 68.30 MJ per kg of energy and 4.860 kg CO 2 per kg emissions for PVC pipes, and 1.24 MJ per kg and 0.148 kg CO 2 per kg for concrete pipes of the same diameter. [32]
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The slabs are typically 120 cm wide with standard thicknesses normally between 15 cm and 50 cm. Reinforcing steel wire rope provides bending resistance. Slabs in prestressed concrete are usually produced in lengths of up to 200 meters. The process involves extruding wet concrete along with the prestressed steel wire rope from a moving mold. The ...