enow.com Web Search

  1. Ad

    related to: 1 4 deck board spacer enough for airflow and water pipe

Search results

  1. Results from the WOW.Com Content Network
  2. Plenum space - Wikipedia

    en.wikipedia.org/wiki/Plenum_space

    Space between the structural ceiling and the dropped ceiling or under a raised floor is typically considered plenum; however, some drop-ceiling designs create a tight seal that does not allow for airflow and therefore may not be considered a plenum air-handling space. [1] [2]

  3. Air gap (plumbing) - Wikipedia

    en.wikipedia.org/wiki/Air_gap_(plumbing)

    According to the International Residential Code 2003, an air gap length must meet the requirements of being two times the effective inner diameter of the pipe (2×D) in order to be sufficient. [2] A standard widely use in the United States is: A112.1.2 Air Gaps in Plumbing Systems (For Plumbing Fixtures and Water-Connected Receptors)

  4. Drain-waste-vent system - Wikipedia

    en.wikipedia.org/wiki/Drain-waste-vent_system

    A sewer pipe is normally at neutral air pressure compared to the surrounding atmosphere.When a column of waste water flows through a pipe, it compresses air ahead of it in the system, creating a positive pressure that must be released so it does not push back on the waste stream and downstream traps, slow drainage, and induce potential clogs.

  5. Flow conditioning - Wikipedia

    en.wikipedia.org/wiki/Flow_conditioning

    Figure (1) showing typical velocity flow profile for natural gas measurement. The most commonly used description of flow conditions within the pipe is the flow velocity profile. Fig.(1) shows the typical flow velocity profile for natural gas measurement. [4] The shape of the flow velocity profile is given by the following equation,

  6. Scupper - Wikipedia

    en.wikipedia.org/wiki/Scupper

    A scupper is an opening in the side walls of a vessel or an open-air structure, which allows water to drain instead of pooling within the bulwark or gunwales of a vessel, or within the curbing or walls of a building. Ship's bulwark. 1. Gunwale, 2. Bulwark plating, 3. Flange, 4. Stanchion, 5. Stringer plate, 6. Stringer angle, 7. Sheerstrake.

  7. Building airtightness - Wikipedia

    en.wikipedia.org/wiki/Building_airtightness

    The airtightness of a building is often expressed in terms of the leakage airflow rate through the building's envelope at a given reference pressure (usually 50 pascal) [10] divided by the: Heated building volume V. At 50·Pa, it is called the air change rate at 50 Pa and usually noted n 50 (units: h −1). [13] [14] Envelope area A E.

  8. Flow separation - Wikipedia

    en.wikipedia.org/wiki/Flow_separation

    Airflow separating from a wing at a high angle of attack. In fluid dynamics, flow separation or boundary layer separation is the detachment of a boundary layer from a surface into a wake. [1] A boundary layer exists whenever there is relative movement between a fluid and a solid surface with viscous forces present in the layer of fluid close to ...

  9. Rim joist - Wikipedia

    en.wikipedia.org/wiki/Rim_joist

    In flooring construction, the rim joists sit on the sill plates; in deck construction, they are parallel to the support beams and sit on the beams or in some cases, cantilever away from the beams. A double thickness board in the position of a rim joist is called a flush beam and serves a dual purpose, providing primary support for the joist ...

  1. Ad

    related to: 1 4 deck board spacer enough for airflow and water pipe