Search results
Results from the WOW.Com Content Network
Victaulic is a developer and manufacturer of mechanical pipe joining systems, and the originator of the grooved pipe couplings joining system. [1] The firm is a global company with 15 major manufacturing facilities, 28 branches, and over 3600 employees worldwide.
Manufacturers such as Victaulic and Grinnell produce sleeve-clamp fittings, which replace many flange connections. They attach to the end of a pipe segment via circumferential grooves pressed (or cut) around the end of the pipe to be joined.
Material take off (MTO) is a term used in engineering and construction, and refers to a list of materials with quantities and types (such as specific grades of steel) that are required to build a designed structure or item.
Control charts are graphical plots used in production control to determine whether quality and manufacturing processes are being controlled under stable conditions. (ISO 7870-1) [1] The hourly status is arranged on the graph, and the occurrence of abnormalities is judged based on the presence of data that differs from the conventional trend or deviates from the control limit line.
In engineering, the Moody chart or Moody diagram (also Stanton diagram) is a graph in non-dimensional form that relates the Darcy–Weisbach friction factor f D, Reynolds number Re, and surface roughness for fully developed flow in a circular pipe. It can be used to predict pressure drop or flow rate down such a pipe.
A flange is a protruded ridge, lip or rim, either external or internal, that serves to increase strength (as the flange of a steel beam such as an I-beam or a T-beam); for easy attachment/transfer of contact force with another object (as the flange on the end of a pipe, steam cylinder, etc., or on the lens mount of a camera); or for stabilizing and guiding the movements of a machine or its ...
In statistical quality control, the individual/moving-range chart is a type of control chart used to monitor variables data from a business or industrial process for which it is impractical to use rational subgroups. [1] The chart is necessary in the following situations: [2]: 231
A Gantt chart is a type of bar chart [4] [5] that illustrates a project schedule. [6] This chart lists the tasks to be performed on the vertical axis, and time intervals on the horizontal axis. [ 4 ] [ 7 ] The width of the horizontal bars in the graph shows the duration of each activity.