A pre-determined overhead rate is normally the term when using a single, plant-wide base to calculate and apply overhead. Overhead is then applied by multiplying the pre-determined overhead rate by the actual driver units. Any difference between applied overhead and the amount of overhead actually incurred is called over- or under-applied overhead.
The difference between the actual direct labor costs and the standard direct labor costs can be divided into a rate variance and an efficiency variance. The difference in manufacturing overhead can be divided into spending, efficiency, and volume variances. Mix and yield variances can also be calculated.
Difference between the amount of labor time that should have been used and the labor that was actually used, multiplied by the standard rate. For example, assume that the standard cost of direct labor per unit of product A is 2.5 hours x $14 = $35. Assume further that during the month of March the company recorded 4500 hours of direct labor time.
In this method cost is absorbed as a percent of the labour cost or the wages. (Overhead cost/Labour cost)x 100 If the Labour cost is 5000 and the overhead cost is 1000 then the absorption cost is 20%. If the labour cost of one job is 500 it will have to absorb 20% i.e. 100 as the overhead cost making the total cost to be 600.
An important part of standard cost accounting is a variance analysis, which breaks down the variation between actual cost and standard costs into various components (volume variation, material cost variation, labor cost variation, etc.) so managers can understand why costs were different from what was planned and take appropriate action to ...
In practice, this equivalence does not always hold, and depending on the period under consideration by management, some overhead expenses (e.g., sales, general and administrative expenses) can be adjusted by management, and the specific allocation of each expense to each category will be decided under cost accounting. In recent years, fixed ...
For a typical job, direct material, labor, subcontract costs, equipment, and other direct costs are tracked at their actual values. These are accrued until the job or batch is completed. Overhead or "burden" may be applied either by using a rate based on direct labor hours or by using some other Activity Based Costing cost driver. In either ...
Manufacturing adds value to raw materials by applying a chain of operations to maintain a deliverable product. There are many operations that can be applied to raw materials such as welding, cutting and painting. It is important to differentiate between direct materials and indirect materials.