enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Settling basin - Wikipedia

    en.wikipedia.org/wiki/Settling_basin

    Translation of required settling time surface area to settling basin geometry requires consideration of short circuiting and turbulence induced by wind, bottom scour, or inlet and overflow design. Settling basin geometry is important because effective time of settling within the basin will be the time a volume of water spends in non-turbulent ...

  3. Sedimentation (water treatment) - Wikipedia

    en.wikipedia.org/wiki/Sedimentation_(water...

    Settling basins and clarifiers should be designed based on the settling velocity (v s) of the smallest particle to be theoretically 100% removed. The overflow rate is defined as: [citation needed] Overflow rate (v o) = Flow of water (Q (m 3 /s)) /(Surface area of settling basin (A(m 2))

  4. Sediment basin - Wikipedia

    en.wikipedia.org/wiki/Sediment_basin

    Sediment trap installed on a construction site.. A sediment trap is a temporary settling basin installed on a construction site to capture eroded or disturbed soil that is washed off during rain storms, and protect the water quality of a nearby stream, river, lake, or bay.

  5. Wastewater treatment - Wikipedia

    en.wikipedia.org/wiki/Wastewater_treatment

    Gravity separation of solids is the primary treatment of sewage, where the unit process is called "primary settling tanks" or "primary sedimentation tanks". [17] It is also widely used for the treatment of other types of wastewater. Solids that are denser than water will accumulate at the bottom of quiescent settling basins.

  6. Settling - Wikipedia

    en.wikipedia.org/wiki/Settling

    Settling is the process by which particulates move towards the bottom of a liquid and form a sediment. Particles that experience a force, either due to gravity or due to centrifugal motion will tend to move in a uniform manner in the direction exerted by that force.

  7. Clarifier - Wikipedia

    en.wikipedia.org/wiki/Clarifier

    The fine particles then build up into a larger mass which then slides down the tube channels. The reduction in solids present in the outflow allows a reduction in the clarifier footprint when designing. Tubes made of PVC plastic are a minor cost in clarifier design improvements and may lead to an increase of operating rate of 2 to 4 times. [14 ...

  8. Talk:Settling - Wikipedia

    en.wikipedia.org/wiki/Talk:Settling

    ABSTRACT Settling Tanks (Sedimentation basins) are the main construction in the water treatment plants and stations. There are about 95% of suspended particles sediment from turbid water. But when it is necessary to design the Settling Tanks we do not calculate main parameters, and usually we have used basically experimental data.

  9. Hydraulic jumps in rectangular channels - Wikipedia

    en.wikipedia.org/wiki/Hydraulic_Jumps_in...

    The height of the hydraulic jump, similar to length, is useful to know when designing waterway structures like settling basins or spillways. The height of the hydraulic jump is simply the difference in flow depths prior to and after the hydraulic jump. The height can be determined using the Froude number and upstream energy. Equations: