Ads
related to: deck girder to post connection cable for concrete
Search results
Results from the WOW.Com Content Network
The deck is a 2.4 m depth tri-cellular concrete box girder and it is suspended by the cable-stays spaced at 12 m. The deck is internally post-tensioned with longitudinal and transverse tendons. The 50 m high central tower is a reinforced concrete tower with a rectangular cross section and variable width in both directions.
The bridge deck was supported by thirteen concrete girders, each spanning 160 feet (49 m). These girders were prestressed by post-tensioning four wire cables embedded in the concrete. Although this type of construction had been used in Europe for quite some time, the Walnut Lane Memorial Bridge was innovative in the United States and led to the ...
An extradosed bridge employs a structure that combines the main elements of both a prestressed box girder bridge and a cable-stayed bridge. [1] [2]: 85 [3] The name comes from the word extrados, the exterior or upper curve of an arch, and refers to how the "stay cables" on an extradosed bridge are not considered as such in the design, but are instead treated as external prestressing tendons ...
A rolled steel girder is a girder that has been fabricated by rolling a blank cylinder of steel through a series of dies to create the desired shape. These create standardized I-beam and wide flange beam [7] shapes up to 100 feet in length. A plate girder is a girder that has been fabricated by welding plates together to create the desired ...
The deck is flexible and lies on the main cables, which are anchored to the earth. Underspanned suspension bridge: an early 19th-century descendant of the simple suspension bridge. The deck is raised on posts above the main cables. Stressed ribbon bridge: a modern descendant of the simple suspension bridge. The deck lies on the main cables, but ...
Batter-post rigid frame bridges are defined by their supports that run from the deck to the abutments at an angle. This design supports the deck in a similar way to v-shaped piers but differs in how the foundations must be built. The piers bear on or next to the abutments, eliminating the need for foundations directly beneath the bridge.
Once several bridge piers are complete, support brackets are attached to adjacent piers and the main parallel girders of the MSS are lifted in place to support the scaffold and concrete forms. Jacks are used to raise the girders and forms and the concrete is poured for the segment (or span) after rebar is placed. After the concrete has cured ...
In the deck-type bridge, a wood, steel or reinforced concrete bridge deck is supported on top of two or more plate girders, and may act compositely with them. In the case of railroad bridges, the railroad ties themselves may form the bridge deck, or the deck may support ballast on which the track is laid.
Ads
related to: deck girder to post connection cable for concrete