Search results
Results from the WOW.Com Content Network
On October 5, 2017, the National Environmental Health Association sponsored a webinar about the hazards involved for workers and residents associated with cured-in-place pipe repair. The video can be found here. [22] Several questions [23] about the webinar, and the study have been raised, and feedback noted by industry members.
Asbestos poses hazards to maintenance personnel who have to drill holes in walls for installation of cables or pipes. Even if the workers are protected, such maintenance operation may release fibers into the air, which may be inhaled by others. Interventions in areas where asbestos is present often have to follow stringent procedures.
Orangeburg pipe (also known as "fiber conduit", "bituminous fiber pipe" or "Bermico" or "sand pipe") is bituminized fiber pipe used in the United States. It is made from layers of ground wood pulp fibers and asbestos fibres compressed with and bound by a water resistant adhesive then impregnated with liquefied coal tar pitch .
[21]: 149 Instead, pipe and fittings with plain (non-belled) connections are butted against each other, and clamped with special rubber sleeve (or "no-hub") fittings. [18]: 71 The rubber sleeves are typically secured with stainless steel worm drive clamping bands, which compress the rubber to make a tight seal around the pipes and fittings.
For example, a 4" pipe, with 1" of thermal insulation makes a 6" penetrant (1" pipe covering on each side of the pipe), plus two pipe sizes = an 8" sleeve, creating a 1" annulus. In case of insulated piping, the size of the insulation must be taken into account for the intended firestop certification listing .
Pipes are often marked to show the insertion depth, so if you cut at a mark, then insert the pipe up to the next mark, you will have a good connection. Hepworth pipe has always had this feature, for example. Making a mark before insertion is advised on pipe that is not pre-marked (e.g. copper pipe). Hepworth supply an insert with bulges on the end.
Pipe replacement by pipe bursting. Trenchless rehabilitation includes such construction methods as spiral wound lining, sliplining, thermoformed pipe, pipe bursting, shotcrete, gunite, cured-in-place pipe (CIPP), grout-in-place pipe, mechanical spot repair, and other methods for the repair, rehabilitation, or replacement of existing buried pipes and structures without excavation, or at least ...
Heat-shrinkable sleeves are applied onto the cutback at the field weld or "field joint" during the construction of a pipeline. As described above, the heat-shrinkable sleeves have an adhesive that sticks the sleeve to the cutback and the factory applied mainline coating and also acts as a corrosion protective layer.