Various abbreviations used for this type of contract are LSTK for lump sum turn key, EPIC for engineering, procurement, installation & commissioning and EPCC for engineering, procurement, construction and commissioning. Use of EPIC is common, e.g., by FIDIC and most Persian Gulf countries. Use of LSTK is common in the Kingdom of Saudi Arabia.
Inducing a breach of contract was a tort of accessory liability, and an intention to cause a breach of contract was a necessary and sufficient requirement for liability; a person had to know that he was inducing a breach of contract and to intend to do so; that a conscious decision not to inquire into the existence of a fact could be treated as ...
Mistake of law is when a party enters into a contract without the knowledge of the law in the country. The contract is affected by such mistakes, but it is not void. The reason here is that ignorance of law is not an excuse. However, if a party is induced to enter into a contract by the mistake of law then such a contract is not valid. [3]
A cost plus contract states that a client agrees to reimburse a construction company for building expenses such as labor, materials, and other costs, plus additional payment usually stated as a percentage of the contract's full price. This type of construction contract is an alternative to lump sum agreements.
Construction law builds upon general legal principles and methodologies and incorporates the regulatory framework (including security of payment, planning, environmental and building regulations); contract methodologies and selection (including traditional and alternative forms of contracting); subcontract issues; causes of action, and liability, arising in contract, negligence and on other ...
The construction documents, specifically the technical specifications, require the contractor to submit product data, samples, and shop drawings to the architect and engineer for approval. This is one of the first steps that is taken by the contractor after execution of the construction contract and issuance of the "Notice to Proceed".
Depending upon the language in the bid proposal, a subcontracting construction company could make its bid final, and, if accepted, a legally enforceable contract is created. In these circumstances, upon determination by the general contractor that a bid is the lowest offer, it can accept the bid and, upon acceptance, a subcontractor cannot ...
Although the Design-Build Institute of America (DBIA) takes the position that design–build can be led by a contractor, a designer, a developer or a joint venture, as long as a design–build entity holds a single contract for both design and construction, some architects have suggested that architect-led design–build is a specific approach ...