Riser clamp for a standpipe through-penetration firestop inside a fire hose cabinet under construction. A riser clamp is a type of hardware used by mechanical building trades for pipe support in vertical runs of piping (risers) at each floor level. The devices are placed around the pipe, and integral fasteners are then tightened to clamp them ...
A flooring clamp is used for holding tongue and groove flooring while individual boards are being face nailed. Up to 8 to 10 boards may be clamped at a time. A minimum of two are required; more is the norm. Spaced say every 4th or 5th joist.
Establishing the lifting anchor positions will influence the rigging arrangements used and therefore the static analysis of the rigging should be determined. Particular rigging configurations may be more suitable for particular job sites or lifting in place considerations, and the lifting design should denote the assumptions accordingly.
The slab lifter uses two safety devices. Safety chains and a support bracket allow safe lifting of large slabs. This lifting appliance also has a safety locking device that is engaged when the gripping pads are activated by the weight of the stone. This prevents any jerking movement from releasing the stone.
A girder (/ ˈ ɡ ɜːr d ər /) is a beam used in construction. [1] It is the main horizontal support of a structure which supports smaller beams. Girders often have an I-beam cross section composed of two load-bearing flanges separated by a stabilizing web , but may also have a box shape, Z shape, or other forms.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Double Girder Overhead Crane The double girder overhead crane structure is used for heavier applications up to 125 tons and reaching over 100 feet of span. It can also be used to gain lifting height because the hoist of the double girder overhead crane is placed on the beams and the hook fits between them.
At the time of the collapse of the bridge, approximately 300 tons of construction equipment was located near several of the under-designed gusset plates. [ 4 ] The bridge was completed in 1967, but in 1977 and 1998, a median barrier, larger outside walls, and a thicker concrete deck were added to the bridge, causing additional loading on the ...