Search results
Results from the WOW.Com Content Network
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
The height of the ribs and beams should be 1 ⁄ 25 of the span between columns. [3] The width of the solid area around the column should be 1 ⁄ 8 of the span between columns. Its height should be the same as the ribs. [3] Diagram showing waffle slab rib and Beam Heights rule of thumb formulas.
The designation for each is given as the approximate height of the beam, the type (beam or column) and then the unit metre rate (e.g., a 460UB67.1 is an approximately 460 mm (18.1 in) deep universal beam that weighs 67.1 kg/m (135 lb/yd)).
The CJ-Series Joists are capable of supporting larger floor or roof loadings due to the attachment of the concrete slab to the top chord of the composite joist. Shear connection between the concrete slab and steel joist is typically made by the welding of shear studs through the steel deck to the underlying CJ-Series Composite Steel Joist. [2]
The first nine blocks in the solution to the single-wide block-stacking problem with the overhangs indicated. In statics, the block-stacking problem (sometimes known as The Leaning Tower of Lire (Johnson 1955), also the book-stacking problem, or a number of other similar terms) is a puzzle concerning the stacking of blocks at the edge of a table.
The Precast/Prestressed Concrete Institute (PCI) published the double tee load capacity calculation (load tables) for the first time in the PCI Design Handbook in 1971. The load tables use the code to identify double tee span type by using the width in feet, followed by "DT", followed by depth in inches, for example, 4DT14 is for 4-foot (1.2 m ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Historically, roof pitch was designated in two other ways: A ratio of the ridge height to the width of the building (span) [6] and as a ratio of the rafter length to the width of the building. [7] Commonly used roof pitches were given names such as: Greek: the ridge height is 1 ⁄ 9 to 1 ⁄ 7 the span (an angle of 12.5° to 16°);