Search results
Results from the WOW.Com Content Network
Alchi Hydroelectric Power Plant. The Nimoo Bazgo Power Project is a run-of-the-river power project on the Indus River situated at Alchi village, 75 kilometres (47 mi) from Leh in the Indian Union Territory of Ladakh. [1] The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006.
The Three Gorges (22,500 MW - 32 × 700 MW and 2 × 50 MW) is operated jointly with the much smaller Gezhouba Dam (2,715 MW), the total generating capacity of this two-dam complex is 25,215 MW. The Itaipu on the Brazil–Paraguay border has 20 generator units with overall 14,000 MW of installed capacity, however the maximum number of generating ...
The most important hydroelectric development in Manitoba is the 3,955-megawatt Nelson River Hydroelectric Project. Its 5 power stations produced 27.4 terawatt-hours of electricity in 2014-2015, meeting 75.7% of the provincial demand.
The John C. Boyle Dam was a hydroelectric dam located in southern Oregon, United States. [1] It was on the upper Klamath River , south (downstream) of Keno , and about 12 miles (19 km) north of the California border. [ 2 ]
To supply water to Plant 1 and 2, a weir with a height ranging 4–16 ft (1.2–4.9 m) creates a small reservoir. The intake for Plant 1 is located just above the left abutment of the weir. Water from the intake enters a 280 ft (85 m) long and 7 ft (2.1 m) diameter vertical penstock which supplies water to the plant. Plant 1 is located in a ...
Limestone Generating Station is a run-of-the-river [1] hydroelectric dam on the Nelson River approximately 750 kilometres (470 mi) north of Winnipeg near Gillam, Manitoba.Part of the Nelson River Hydroelectric Project, Limestone was Manitoba Hydro's fifth and largest generating station to be built on the Nelson River.
Rangit Dam (Hindi: रन्गीत् बाँध Bāndh), which forms the headworks of the Rangit Hydroelectric Power Project Stage III, is a run-of-the-river hydroelectric power project on the Ranjit River, a major tributary of the Teesta River in the South Sikkim district of the Northeastern Indian state of Sikkim. The project's ...
The Lal Bahadur Shastri Dam is also known as Almatti Dam is a hydroelectric project on the Krishna River [1] in North Karnataka, India which was completed in July 2005. The target annual electric output of the dam is 560 MU (or GWh).