enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Intersection capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Intersection_Capacity...

    Synchro 5.0, the LOS analysis software, also calculates Intersection Capacity Utilization (ICU) which provides additional insight as to how well an intersection is functioning and how much extra capacity is available to handle future growth, traffic fluctuation and incidents. The ICU calculation does not use existing signal timings or sign control.

  3. Capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Capacity_utilization

    Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity (maximum output of a firm or nation). It is the relationship between output that is produced with the installed equipment, and the potential output which could be produced with it, if capacity was fully used. [ 1 ]

  4. Capacity planning - Wikipedia

    en.wikipedia.org/wiki/Capacity_planning

    Capacity planning is the process of determining the production capacity needed by an organization to meet changing demands for its products. [1] In the context of capacity planning, design capacity is the maximum amount of work that an organization or individual is capable of completing in a given period.

  5. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  6. Overall equipment effectiveness - Wikipedia

    en.wikipedia.org/wiki/Overall_equipment...

    Overall equipment effectiveness [1] (OEE) is a measure of how well a manufacturing operation is utilized (facilities, time and material) compared to its full potential, during the periods when it is scheduled to run.

  7. Load duration curve - Wikipedia

    en.wikipedia.org/wiki/Load_duration_curve

    The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity factor. The product of the two is a measure of electrical energy (e.g. kilowatthours).

  8. Design load - Wikipedia

    en.wikipedia.org/wiki/Design_load

    A crane's rated load is its Safe Working Load (SWL) and the design load (DL) is, (p 90) [1] = The dynamic lift factor for offshore cranes in the range 10 kN < SWL ≤ 2500 kN is not less than =.(p 84) [1] Thus for a crane with a SWL of 2000 kN (~200 tonne) its design load is not less than, = = The minimum breaking load (MBL) for the combined capacity of reeves of a steel wire hoisting rope ...

  9. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    Utilization factor (solid line) with blade-to-gas speed ratio. The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used.