Search results
Results from the WOW.Com Content Network
Another important relationship is that if the fixed swap rate is equal to the strike of the caps and floors, then we have the following put–call parity: Cap-Floor = Swap. Caps and floors have the same implied vol too for a given strike. Imagine a cap with 20% vol and floor with 30% vol. Long cap, short floor gives a swap with no vol.
In mathematics, the floor function is the function that takes as input a real number x, and gives as output the greatest integer less than or equal to x, denoted ⌊x⌋ or floor(x). Similarly, the ceiling function maps x to the least integer greater than or equal to x , denoted ⌈ x ⌉ or ceil( x ) .
A method analogous to piece-wise linear approximation but using only arithmetic instead of algebraic equations, uses the multiplication tables in reverse: the square root of a number between 1 and 100 is between 1 and 10, so if we know 25 is a perfect square (5 × 5), and 36 is a perfect square (6 × 6), then the square root of a number greater than or equal to 25 but less than 36, begins with ...
Turning is a term used when referring to moving the level to take an elevation shot from a different location. To "turn" the level, one must first take a reading and record the elevation of the point the rod is located on. While the rod is being kept in exactly the same location, the level is moved to a new location where the rod is still visible.
A suanpan (top) and a soroban (bottom). The two abaci seen here are of standard size and have thirteen rods each. Another variant of soroban. The soroban is composed of an odd number of columns or rods, each having beads: one separate bead having a value of five, called go-dama (五玉, ごだま, "five-bead") and four beads each having a value of one, called ichi-dama (一玉, いちだま ...
In civil engineering, concrete leveling is a procedure that attempts to correct an uneven concrete surface by altering the foundation that the surface sits upon. It is a cheaper alternative to having replacement concrete poured and is commonly performed at small businesses and private homes as well as at factories, warehouses, airports and on roads, highways and other infrastructure.
An alternative raised floor application with disposable formworks from job site in Turkey A suction-cup tile lifter has been used to remove a tile.. A raised floor (also raised flooring, access floor(ing), or raised-access computer floor) provides an elevated structural floor above a solid substrate (often a concrete slab) to create a hidden void for the passage of mechanical and electrical ...
Resource-leveling can take the "work demand" and balance it against the resource pool availability for the given week. The goal is to create this weekly schedule in advance of performing the work. Without resource-leveling the organization (planner, scheduler, supervisor) is most likely performing subjective selection.